Lead time prediction in unbalanced production systems

被引:7
|
作者
Ruben, RA
Mahmoodi, F [1 ]
机构
[1] Clarkson Univ, Sch Business, Potsdam, NY 13699 USA
[2] Iowa State Univ Sci & Technol, Coll Business, Dept Logist Operat & MIS, Ames, IA 50011 USA
关键词
D O I
10.1080/002075400188816
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Whether job due dates are set internally or externally, it is critical for the shop floor controller to be able to accurately predict job lead times. Previous research has shown that utilizing information on the congestion levels along a job's route is more valuable than overall shop congestion levels when predicting job lead times. While this information is easily attained in a simulation model, in industrial applications the task may be considerably more difficult, especially when lot splitting is used to accelerate material flow. We examine the effectiveness of three lead time estimation procedures which utilize different shop information in bottleneck-constrained production systems where lot splitting is practiced under a variety of experimental conditions. The results indicate that accurate lead time estimates can be obtained using information pertaining solely to the bottleneck work centre when the bottleneck is at an entry work centre. This offers operations managers a substantial ease in implementation over previously reported methods. The results also show that the operations managers interested in accurately estimating job lead times are well advised to take advantage of the excess capacity at non-bottleneck work centres by performing additional setups, and take measures that reduce bottleneck shiftiness.
引用
收藏
页码:1711 / 1729
页数:19
相关论文
共 50 条
  • [1] Lot splitting in unbalanced production systems
    Ruben, RA
    Mahmoodi, F
    DECISION SCIENCES, 1998, 29 (04) : 921 - 949
  • [2] Lot sizing and lead time decisions in production/inventory systems
    Noblesse, Ann M.
    Boute, Robert N.
    Lambrecht, Marc R.
    Van Houdt, Benny
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 155 : 351 - 360
  • [3] Lead time instability and its mitigation in production work systems
    Duffie, Neil
    Bendul, Julia
    Windt, Katja
    Knollmann, Mathias
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2016, 65 (01) : 437 - 440
  • [4] VALUING THE LEAD TIME OF PERIODIC FORECASTS IN DYNAMIC PRODUCTION SYSTEMS
    MJELDE, JW
    DIXON, BL
    AGRICULTURAL SYSTEMS, 1993, 42 (1-2) : 41 - 55
  • [5] Online lead time prediction supporting situation-aware production control
    Gyulai, David
    Pfeiffer, Andras
    Bergmann, Julia
    Gallina, Viola
    6TH CIRP GLOBAL WEB CONFERENCE - ENVISAGING THE FUTURE MANUFACTURING, DESIGN, TECHNOLOGIES AND SYSTEMS IN INNOVATION ERA (CIRPE 2018), 2018, 78 : 190 - 195
  • [6] Time Machine: Generative Real-Time Model For Failure (and Lead Time) Prediction in HPC Systems
    Alharthi, Khalid Ayed
    Jhumka, Arshad
    Di, Sheng
    Gui, Lin
    Cappello, Franck
    McIntosh-Smith, Simon
    2023 53RD ANNUAL IEEE/IFIP INTERNATIONAL CONFERENCE ON DEPENDABLE SYSTEMS AND NETWORKS, DSN, 2023, : 508 - 521
  • [7] EVALUATION OF LEAD TIME IN PRODUCTION/INVENTORY SYSTEMS WITH NONSTATIONARY STOCHASTIC DEMAND
    VENDEMIA, WG
    PATUWO, BE
    HUNG, MS
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (02) : 221 - 233
  • [8] Influence of dispatching rules on average production lead time for multi-stage production systems
    Huebl, Alexander
    Jodlbauer, Herbert
    Altendorfer, Klaus
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (02) : 479 - 484
  • [9] DETERMINING THE NUMBER OF KANBANS FOR UNBALANCED SERIAL PRODUCTION SYSTEMS
    TAKAHASHI, K
    COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) : 213 - 216
  • [10] Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?
    Thurer, Matthias
    Fernandes, Nuno O.
    Haeussler, Stefan
    Stevenson, Mark
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2023, 61 (04) : 1268 - 1282