An integrative contingency model of software project risk management

被引:216
|
作者
Barki, H [1 ]
Rivard, S
Talbot, J
机构
[1] Dept Informat Technol, Montreal, PQ, Canada
[2] Ecole Hautes Etud Commerciales, HEC, Montreal, PQ, Canada
关键词
contingency models; software project management; software project risk;
D O I
10.1080/07421222.2001.11045666
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Drawing both from the IS literature on software project risk management and the contingency research in Organization Theory literature, the present study develops an integrative contingency model of software project risk management. Adopting a profile deviation perspective of fit, the outcome of a software development project (Performance) is hypothesized to be influenced by the fit between the project's risk (Risk Exposure) and how project risk is managed (Risk Management Profile). The research model was tested with longitudinal data obtained from project leaders and key users of 75 software projects. The results support the contingency model proposed and suggest that in order to increase project performance a project's risk management profile needs to vary according to the project's risk exposure. Specifically, high-risk projects were found to call for high information processing capacity approaches in their management. However, the most appropriate management approach was found td depend on the performance criterion used. When meeting project budgets was the performance criterion, successful high-risk projects had high levels of internal integration, as well as high levels of formal planning. When system quality was the performance criterion, successful high-risk projects had high levels of user participation.
引用
收藏
页码:37 / 69
页数:33
相关论文
共 50 条
  • [31] AN INTEGRATIVE SYSTEM DYNAMICS PERSPECTIVE OF SOFTWARE PROJECT-MANAGEMENT - EXAMPLES OF PROJECT ESTIMATION AND SCHEDULING EXPERIMENTS
    ABDELHAMID, TK
    MADNICK, SE
    [J]. SYSTEM DYNAMICS 1989: PLUS SUPPLEMENTARY PROCEEDINGS, 1989, : 17 - 25
  • [32] An Integrative Simulation Model for Project Management in Chemical Process Engineering
    Kausch, Bernhard
    Schneider, Nicole
    Grant, Morten
    Schlick, Christopher
    [J]. COMPLEX SYSTEMS AND SELF-ORGANIZATION MODELLING, 2009, : 211 - 232
  • [33] An integrative simulation model for project management in chemical process engineering
    Kausch, Bernhard
    Schneider, Nicole
    Grandt, Morten
    Schlick, Christopher
    [J]. MODELLING AND SIMULATION 2006, 2006, : 501 - +
  • [34] SERGE - Serious Game for the Education of Risk Management in Software Project Management
    Annunziata, Giusy
    Lambiase, Stefano
    Palomba, Fabio
    Ferrucci, Filomena
    [J]. 2024 ACM/IEEE 44TH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING: SOFTWARE ENGINEERING EDUCATION AND TRAINING, ICSE-SEET 2024, 2024, : 264 - 273
  • [35] A meta-model of work structure of software project and a framework for software project management systems
    Komiya, S
    Hazeyama, A
    [J]. IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 1998, E81D (12) : 1415 - 1428
  • [36] The Model of Risk Management in Project Logistics
    Zeng, Rong
    Xiao, Hanbin
    Zhang, Hong
    [J]. LISS 2014, 2015, : 61 - 65
  • [37] A risk management model for project execution
    ALHawari, Sarner
    Thabtah, Fadi
    Karadsheh, Louay
    Hadi, Wa'el Musa
    [J]. INFORMATION MANAGEMENT IN THE MODERN ORGANIZATIONS: TRENDS & SOLUTIONS, VOLS 1 AND 2, 2008, : 887 - 893
  • [38] Project risk management conceptual model
    Kamissoko, Daouda
    Marmier, Francois
    Gourc, Didier
    [J]. PROCEEDINGS OF THE 3RD IEEE INTERNATIONAL CONFERENCE ON LOGISTICS OPERATIONS MANAGEMENT (GOL'16), 2016,
  • [39] BOSS Software Project Management Iterative and Adaptive Software Project Management
    Liu, Lei
    [J]. NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 112 - 114
  • [40] An Evolutionary Software Project Management Maturity Model for Mauritius
    Sukhoo, Aneerav
    Barnard, Andries
    Eloff, Mariki M.
    Van Der Poll, John A.
    [J]. Interdisciplinary Journal of Information, Knowledge, and Management, 2007, 2 : 99 - 118