An integrative contingency model of software project risk management

被引:216
|
作者
Barki, H [1 ]
Rivard, S
Talbot, J
机构
[1] Dept Informat Technol, Montreal, PQ, Canada
[2] Ecole Hautes Etud Commerciales, HEC, Montreal, PQ, Canada
关键词
contingency models; software project management; software project risk;
D O I
10.1080/07421222.2001.11045666
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Drawing both from the IS literature on software project risk management and the contingency research in Organization Theory literature, the present study develops an integrative contingency model of software project risk management. Adopting a profile deviation perspective of fit, the outcome of a software development project (Performance) is hypothesized to be influenced by the fit between the project's risk (Risk Exposure) and how project risk is managed (Risk Management Profile). The research model was tested with longitudinal data obtained from project leaders and key users of 75 software projects. The results support the contingency model proposed and suggest that in order to increase project performance a project's risk management profile needs to vary according to the project's risk exposure. Specifically, high-risk projects were found to call for high information processing capacity approaches in their management. However, the most appropriate management approach was found td depend on the performance criterion used. When meeting project budgets was the performance criterion, successful high-risk projects had high levels of internal integration, as well as high levels of formal planning. When system quality was the performance criterion, successful high-risk projects had high levels of user participation.
引用
收藏
页码:37 / 69
页数:33
相关论文
共 50 条
  • [21] Identification of critical risk factors in software project risk management
    Jiang, GP
    Chen, YW
    [J]. ISMOT'04: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY: MANAGING TOTAL INNOVATION IN THE 21ST CENTURY, 2004, : 211 - 215
  • [22] Research on management model of software project development
    Zhang, Ju-Jian
    Jiang, Yan
    [J]. Information Technology Journal, 2013, 12 (20) : 5583 - 5588
  • [23] A FORMAL MODEL FOR SOFTWARE PROJECT-MANAGEMENT
    LIU, LC
    HOROWITZ, E
    [J]. IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1989, 15 (10) : 1280 - 1293
  • [24] An Intelligent Model for Software Project Risk Prediction
    Hu, Yong
    Zhang, Xiangzhou
    Sun, Xin
    Liu, Mei
    Du, Jianfeng
    [J]. 2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 629 - 632
  • [25] A risk prediction model for software project management based on similarity analysis of context histories
    Filippetto, Alexsandro Souza
    Lima, Robson
    Barbosa, Jorge Luis Victoria
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2021, 131
  • [26] AN EVALUATION OF SOFTWARE PROJECT RISK MANAGEMENT IN SOUTH AFRICA
    de Wet, B.
    Visser, J. K.
    [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 24 (01) : 14 - 28
  • [27] BBN-based software project risk management
    Fan, CF
    Yu, YC
    [J]. JOURNAL OF SYSTEMS AND SOFTWARE, 2004, 73 (02) : 193 - 203
  • [28] Software Project Development Risk Reliability Design and Management
    Chang, M. J.
    Jia, X.
    [J]. FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY V, 2015, : 490 - 494
  • [29] Strategies for Scheduling Risk Mitigation in Software Project Management
    Zhou, Peng
    Leung, Hareton K. N.
    [J]. SOFTWARE TECHNOLOGIES (ICSOFT 2013), 2014, 457 : 3 - 23
  • [30] Model Research of Software Project Management Based On Knowledge Management
    Cui, Junmei
    Yu, Li
    [J]. INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1298 - 1302