Construction monitoring of prestressed concrete continuous beam bridge

被引:0
|
作者
Li, Congqi [1 ]
Ge, Wenjie [1 ]
Cao, Dafu [1 ]
Wang, Biyuan [1 ]
机构
[1] Yangzhou Univ, Coll Civil Sci & Engn, Yangzhou 225127, Jiangsu, Peoples R China
来源
关键词
prestressed concrete; continuous beam bridge; construction monitoring;
D O I
10.4028/www.scientific.net/AMR.919-921.308
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The creep of concrete structure has a prodigious effect on bridge alignments and the stress control during the bridge construction. In the meantime, the problems such as pre-stress losses, bearing asymmetry sink, the concrete box-beam deflection, box-beam web cracks, structure stress redistributing and so on, which make the bridge structure lose functions or even invalid early when it works. For these reasons, the construction monitor of the deformation and the long-term deflection of long-span bridges with high piers have important practical significance. Construction monitoring of prestressed concrete continuous beam bridge - new Tongyang canal bridge which adopt cantilever construction work is made.
引用
收藏
页码:308 / 312
页数:5
相关论文
共 50 条
  • [21] Construction monitoring for prestressed concrete space structure
    Xue, Wei-Chen
    Liu, Zhen-Yong
    Jiang, Dong-Sheng
    Xu, Zhuang-Tao
    [J]. STRUCTURAL CONDITION ASSESSMENT, MONITORING AND IMPROVEMENT, VOLS 1 AND 2, 2007, : 836 - 841
  • [22] Safety BIM intelligent modeling analysis of prestressed concrete continuous girder bridge construction scene
    Li, Tao
    Cong, Bori
    Yan, Maowang
    Li, Qingying
    Zhu, Xinyuan
    [J]. BRIDGE STRUCTURES, 2023, 19 (1-2) : 31 - 39
  • [23] Structural analysis and segment construction control experiment of prestressed concrete continuous rigid frame bridge
    Lei, Junqing
    Wang, Nan
    [J]. ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 1148 - 1157
  • [24] Structure simulation analysis on prestressed concrete continuous rigid-frame bridge under construction
    Bai, Guoliang
    Su, Wu
    Li, Xiaowen
    Jiao, Jiangwei
    [J]. ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 645 - 652
  • [25] Long span prestressed concrete continuous rigid-frame bridge ANN construction control
    Ren, Geng Feng
    Zou, Cun Jun
    Xu, Yue
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 2261 - 2264
  • [26] RESERCH ON HIGH-SPEED RAIL PRESTRESSED CONCRETE CONTINUOUS BEAM BRIDGE DESIGN DEFORMATION
    Zhang, Nan
    Lei, Junqing
    Zhang, Kun
    [J]. NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 825 - 828
  • [27] Prestressed concrete beam bridge design and main parameters of prestressed steel beam calculations and arrangement
    Yin Xijun
    [J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE IV, PTS 1-5, 2014, 496-500 : 2501 - 2504
  • [28] Smart health monitoring system for a prestressed concrete bridge
    Wang, X
    Wang, ML
    Zhao, Y
    Chen, H
    Zhou, LL
    [J]. SMART STRUCTURES AND MATERIALS 2004: SENSORS AND SMART STRUCTURES TECHNOLOGIES FOR CIVIL, MECHANICAL, AND AEROSPACE SYSTEMS, 2004, 5391 : 597 - 608
  • [29] Vibration monitoring and damage experiment on a prestressed concrete bridge
    Vera, O. S. Luna
    Kondo, Y.
    Kim, C. W.
    Oshima, Y.
    [J]. ADVANCES IN ENGINEERING MATERIALS, STRUCTURES AND SYSTEMS: INNOVATIONS, MECHANICS AND APPLICATIONS, 2019, : 2041 - 2046
  • [30] Research on construction monitoring of curvilinear continuous beam bridge jacking and horizontal moving construction
    Zheng, Xilong
    [J]. ARCHIVES OF CIVIL ENGINEERING, 2024, 70 (02) : 543 - 560