Research on construction monitoring of curvilinear continuous beam bridge jacking and horizontal moving construction

被引:0
|
作者
Zheng, Xilong [1 ]
机构
[1] Harbin Univ, Sch Civil & Architectural Engn, 109 Zhongxing Da Dao, Harbin, Peoples R China
关键词
continuous beam bridge; jacking construction; shifting construction; construction monitoring; TORSION; BOX;
D O I
10.24425/ace.2024.149880
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article investigates the issue of beam misalignment in continuous curved beam bridges. Taking the D0-D6 spans of the Gongbin Road elevated bridge as a basis, real-time monitoring of the stress and displacement of the beams is carried out during the jacking and shifting construction process. At the same time, the reaction forces of each support are monitored. The jacking force of the hydraulic jacks is controlled to ensure the stability and safety of the beam during the construction process. Finally, the jacking and shifting monitoring data is organized and compared with theoretical values. It is found that the stress values generated during the jacking phase of the bridge are below the stress control standard. No uplift phenomenon occurs at the supports, and the jacking height is controlled within a reasonable range. The construction process does not cause damage to the beams, and it is safe and reliable. During the shifting construction, the whole bridge was displaced using the jacking method, and the three working conditions were monitored throughout the process. The stress increment at the 2# and 4# sections was relatively small, and the measured stress increments for the entire bridge were all below the stress control standard. The displacement of the bridge abutment during the jacking process was minimal, with no contact with the abutment blocks, and no significant elastic deformation occurred. The jacking displacement was successfully achieved.
引用
收藏
页码:543 / 560
页数:18
相关论文
共 50 条
  • [1] FINITE ELEMENT SIMULATION ANALYSIS OF CURVILINEAR CONTINUOUS BEAM BRIDGE JACKING AND TRANSLATION CONSTRUCTION
    Zheng, Xilong
    Li, Wei
    Zhang, Honglei
    Wang, Qiong
    [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2024, 33 (01): : 105 - 119
  • [2] FINITE ELEMENT SIMULATION ANALYSIS OF CURVILINEAR CONTINUOUS BEAM BRIDGE JACKING AND TRANSLATION CONSTRUCTION
    Zheng, Xilong
    Yan, Jinshuo
    Li, Peng
    Li, Wei
    Wang, Qiong
    [J]. CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2024, 33 (02): : 261 - 274
  • [3] Analysis and monitoring on jacking construction of continuous box girder bridge
    Li, Fangyuan
    Wu, Peifeng
    Yan, Xinfei
    [J]. COMPUTERS AND CONCRETE, 2015, 16 (01): : 49 - 65
  • [4] Research of Synchronous Jacking up Construction Monitoring and Control Technologies of Bridge
    He, Jia
    Gao, Xingzan
    [J]. PROCEEDINGS OF THE 2016 2ND INTERNATIONAL CONFERENCE ON ARCHITECTURAL, CIVIL AND HYDRAULICS ENGINEERING (ICACHE 2016), 2016, 99 : 39 - 44
  • [5] Construction monitoring of prestressed concrete continuous beam bridge
    Li, Congqi
    Ge, Wenjie
    Cao, Dafu
    Wang, Biyuan
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 308 - 312
  • [6] Field Monitoring of a Tunnel Bridge During Jacking Construction
    Lu, Wenliang
    Li, Wenhui
    [J]. PROCEEDINGS OF 2009 8TH INTERNATIONAL CONFERENCE ON RELIABILITY, MAINTAINABILITY AND SAFETY, VOLS I AND II: HIGHLY RELIABLE, EASY TO MAINTAIN AND READY TO SUPPORT, 2009, : 502 - +
  • [7] Field monitoring of a tunnel bridge during jacking construction
    School of Civil Engineering, Beijing Jiaotong University, Beijing, China
    不详
    [J]. Proc. Int. Conf. Reliab., Maintainab. Saf., ICRMS, (502-506):
  • [8] Monitoring and control of steel truss arch bridge jacking construction
    Zheng, Xilong
    Guan, Di
    [J]. Archives of Civil Engineering, 2024, 70 (03) : 19 - 37
  • [9] The research of stress monitoring in construction stage of concrete continuous bridge
    Chen, Shuli
    Cao, Yaling
    Feng, Xiaoli
    [J]. ISISS 2005: Innovation & Sustainability of Structures, Vol 1-3, 2005, : 1173 - 1181
  • [10] MONITORING AND ASSESSMENT OF A FRAME TUNNEL BRIDGE DURING JACKING CONSTRUCTION STAGE
    Lu, Wenliang
    Su, Dan
    Dong, Dawei
    [J]. ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1051 - 1057