Safety BIM intelligent modeling analysis of prestressed concrete continuous girder bridge construction scene

被引:0
|
作者
Li, Tao [1 ]
Cong, Bori [2 ]
Yan, Maowang [1 ]
Li, Qingying [3 ]
Zhu, Xinyuan [2 ]
机构
[1] Shandong Expressway Construct Management Grp Co L, Jinan, Shandong, Peoples R China
[2] Shandong Expressway Engn Consulting Grp Co Ltd, Jinan, Shandong, Peoples R China
[3] Shandong Expressway Engn Testing Co Ltd, Jinan, Shandong, Peoples R China
关键词
Prestress; Continuous girder bridge; Construction scene; Security; BIM; Intelligent modeling;
D O I
10.3233/BRS-230203
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
BIM intelligent modeling is used to analyze the safety of the construction scene of prestressed concrete continuous girder bridge, so as to realize the safety management of the bridge construction scene and improve the construction efficiency. The construction safety analysis system is used to analyze the binding data of construction safety, and the data is combined with the self-applicable equilibrium control and the game equilibrium control to build the construction scene safety objective function model. On this basis, combined with the control constraints of the whole life cycle, the statistical analysis regression model is used to build the scene safety analysis model based on BIM. The whole life cycle safety intelligent analysis of the construction scene is realized, and the improved particle swarm optimization algorithm is used to solve the model by adaptive differential evolution, so as to shorten the calculation time of the model. The experimental results show that the safety management performance of the proposed method is high, and the safety management evaluation grade is 285. The identification accuracy of main beam stress change is high. Under the conditions of unbalanced load, combination of unbalanced load and prestress, combination of wind load and prestress and unbalanced load, the safety analysis of upper edge stress and lower edge stress of main beam can be effectively completed, and the construction safety of prestressed concrete continuous beam bridge can be realized.
引用
收藏
页码:31 / 39
页数:9
相关论文
共 50 条
  • [1] Analysis of the Causes of the Formation of Crack in Inclined Web of Prestressed Concrete Continuous Girder Bridge in Cantilever Construction
    Lu, Lihua
    Tian, Peng
    Yu, Tao
    [J]. ADVANCES IN CIVIL ENGINEERING II, PTS 1-4, 2013, 256-259 : 1614 - 1617
  • [2] Application of Displacement Back Analysis in Geometry Monitoring of Segmental Construction of Prestressed Concrete Continuous Girder Bridge
    Sun, Xuexian
    Liu, Zhen
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1082 - 1086
  • [3] Research on Deflection and Cracking of Prestressed Concrete Continuous Girder Bridge
    Guo, Fan
    Yang, Yongqing
    Huang, Shengqian
    [J]. CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 1014 - 1017
  • [4] Prestressed Concrete Continuous Girder bridge Reinforcement Simulation Analysis and Carrying Capacity Assessment
    Yu, Ling
    Qiao, Tiezhu
    Bao, Longsheng
    Zhu, Guangshan
    [J]. ADVANCES IN INDUSTRIAL AND CIVIL ENGINEERING, PTS 1-4, 2012, 594-597 : 1516 - 1521
  • [5] DESIGN AND CONSTRUCTION OF A MODEL PRESTRESSED CONCRETE BIFURCATED BOX GIRDER BRIDGE
    PERRY, SH
    WALDRON, P
    PINKNEY, MW
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 2-RESEARCH AND THEORY, 1985, 79 (SEP): : 439 - 454
  • [6] A study of the cracks of prestressed concrete continuous box-girder bridge
    Li, Min
    Wang, Zhuang
    [J]. PROCEEDINGS OF THE 2016 5TH INTERNATIONAL CONFERENCE ON CIVIL, ARCHITECTURAL AND HYDRAULIC ENGINEERING (ICCAHE 2016), 2016, 95 : 586 - 591
  • [7] PRESTRESSED COMPOSITE CONTINUOUS BRIDGE GIRDER
    ANAND, SC
    FENNELL, CJ
    [J]. JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1976, 102 (01): : 313 - 318
  • [8] Construction monitoring of prestressed concrete continuous beam bridge
    Li, Congqi
    Ge, Wenjie
    Cao, Dafu
    Wang, Biyuan
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 308 - 312
  • [9] Structural effects of temperature gradient on a continuous prestressed concrete girder bridge: analysis and field measurements
    Hossain, Tanvir
    Segura, Seth
    Okeil, Ayman M.
    [J]. STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2020, 16 (11) : 1539 - 1550
  • [10] The posttensioning method of prestressed concrete continuous box girder construction technology
    Han, Jinliang
    Li, Jiguo
    Mo, Zongyun
    [J]. PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 3091 - 3096