Safety BIM intelligent modeling analysis of prestressed concrete continuous girder bridge construction scene

被引:0
|
作者
Li, Tao [1 ]
Cong, Bori [2 ]
Yan, Maowang [1 ]
Li, Qingying [3 ]
Zhu, Xinyuan [2 ]
机构
[1] Shandong Expressway Construct Management Grp Co L, Jinan, Shandong, Peoples R China
[2] Shandong Expressway Engn Consulting Grp Co Ltd, Jinan, Shandong, Peoples R China
[3] Shandong Expressway Engn Testing Co Ltd, Jinan, Shandong, Peoples R China
关键词
Prestress; Continuous girder bridge; Construction scene; Security; BIM; Intelligent modeling;
D O I
10.3233/BRS-230203
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
BIM intelligent modeling is used to analyze the safety of the construction scene of prestressed concrete continuous girder bridge, so as to realize the safety management of the bridge construction scene and improve the construction efficiency. The construction safety analysis system is used to analyze the binding data of construction safety, and the data is combined with the self-applicable equilibrium control and the game equilibrium control to build the construction scene safety objective function model. On this basis, combined with the control constraints of the whole life cycle, the statistical analysis regression model is used to build the scene safety analysis model based on BIM. The whole life cycle safety intelligent analysis of the construction scene is realized, and the improved particle swarm optimization algorithm is used to solve the model by adaptive differential evolution, so as to shorten the calculation time of the model. The experimental results show that the safety management performance of the proposed method is high, and the safety management evaluation grade is 285. The identification accuracy of main beam stress change is high. Under the conditions of unbalanced load, combination of unbalanced load and prestress, combination of wind load and prestress and unbalanced load, the safety analysis of upper edge stress and lower edge stress of main beam can be effectively completed, and the construction safety of prestressed concrete continuous beam bridge can be realized.
引用
收藏
页码:31 / 39
页数:9
相关论文
共 50 条
  • [31] RESEARCH ON SEISMIC RESISTANCE PERFORMANCE OF CONTINUOUS PRESTRESSED CONCRETE GIRDER BRIDGE AT STRONG EARTHQUAKE ZONE
    Zhao, Zhimeng
    Fan, Caixia
    Wang, Zhenji
    Li, Zhi
    Wang, Jixiang
    Yang, Yajuan
    [J]. ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 2233 - 2238
  • [32] Radar Measurement of Pier-Top Segment Depression of Prestressed Concrete Continuous Girder Bridge
    Yang, San-Qiang
    Dai, Ze-Yu
    Jin, Jin-Zhao
    Zhang, Dan
    [J]. Bridge Construction, 2022, 52 (04) : 89 - 94
  • [33] LOAD TESTING OF A MODEL 2-SPAN CONTINUOUS PRESTRESSED CONCRETE TRAPEZOIDAL BRIDGE GIRDER
    CAMPBELL, TI
    BATCHELOR, BD
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1977, 22 (06): : 62 - 79
  • [34] Dynamic finite element model updating of prestressed concrete continuous box-girder bridge
    Lin Xiankun
    Zhang Lingmi
    Guo Qintao
    Zhang Yufeng
    [J]. EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2009, 8 (03) : 399 - 407
  • [35] Experimental Study on Damage of Prestressed Concrete Continuous Girder Bridge Subjected to Explosions above the Deck
    Yuan, Su-Jing
    Zong, Zhou-Hong
    Lou, Fan
    Lin, Jin
    [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2022, 35 (11): : 160 - 170
  • [36] Load Model Experiment of Prestressed Concrete Continuous Girder Bridge Subjected to Explosion above the Deck
    Gao, Chao
    Zong, Zhou-Hong
    Lou, Fan
    Yuan, Su-Jing
    Lin, Jin
    [J]. Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2022, 35 (12): : 106 - 114
  • [37] Research of Vertical Prestressed Losses During Construction Process of PC Continuous Box Girder Bridge
    Zhang, Kechao
    Chen, Jianzhang
    Liu, Haiqiang
    Zheng, Yi
    [J]. ADVANCES IN CIVIL STRUCTURES, PTS 1 AND 2, 2013, 351-352 : 1142 - 1145
  • [38] Prestressed concrete skew continuous box girder design
    [J]. Tu, Yang-Zhi, 1600, Editorial Department of Journal of Railway Engineering Society, China (31):
  • [39] Analysis and Computation Method of Prestressed Concrete Bridge in Construction Control
    Tan, Sui
    Yu, Zhiwu
    Zhang, Huashuai
    [J]. VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT I, PTS 1-3, 2012, 105-107 : 867 - 875
  • [40] Analysis and monitoring on jacking construction of continuous box girder bridge
    Li, Fangyuan
    Wu, Peifeng
    Yan, Xinfei
    [J]. COMPUTERS AND CONCRETE, 2015, 16 (01): : 49 - 65