Optimization-based available-to-promise with multi-stage resource availability

被引:56
|
作者
Zhao, ZY [1 ]
Ball, MO
Kotake, M
机构
[1] Univ Maryland, Robert H Smith Sch Business, College Pk, MD 20742 USA
[2] Univ Maryland, Syst Res Inst, College Pk, MD 20742 USA
[3] Toshiba Co Ltd, Corp Mfg Engn Ctr, Isogo Ku, Yokohama, Kanagawa 2350017, Japan
基金
美国国家科学基金会;
关键词
available-to-promise; manufacturing order; production capability; order-promising and fulfillment; mixed-integer-programming;
D O I
10.1007/s10479-005-6235-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Increasingly, customer service, rapid response to customer requirements, and flexibility to handle uncertainties in both demand and supply are becoming strategic differentiators in the marketplace. Organizations that want to achieve these benchmarks require sophisticated approaches to conduct order promising and fulfillment, especially in todays high-mix low-volume production environment. Motivated by these challenges, the Available-to-Promise (ATP) function has migrated from a set of availability records in a Master Production Schedule (MPS) toward an advanced real-time decision support system to enhance decision responsiveness and quality in Assembly To Order (ATO) or Configuration To Order (CTO) environments. Advanced ATP models and systems must directly link customer orders with various forms of available resources, including both material and production capacity. In this paper, we describe a set of enhancements carried out to adapt previously published mixed-integer-programming (MIP) models to the specific requirements posed by an electronic product supply chain within Toshiba Corporation. This model can provide individual order delivery quantities and due dates, together with production schedules, for a batch of customer orders that arrive within a predefined batching interval. The model considers multi-resource availability including manufacturing orders, production capability and production capacity. In addition, the model also takes into account a variety of realistic order promising issues such as order splitting, model decomposition and resource expediting and de-expediting. We conclude this paper with comparison of our model execution results vs. actual historical performance of systems currently in place.
引用
收藏
页码:65 / 85
页数:21
相关论文
共 50 条
  • [41] Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing
    Tsai, Kune-Muh
    Wang, Shan-Chi
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 117 (01) : 174 - 184
  • [42] Customer Order Fulfillment Based on a Rolling Horizon Available-to-Promise Mechanism: Solution by Fuzzy Approach and Genetic Algorithm
    Cheng, Chi-Bin
    Wu, Meng-Tsung
    INTELLIGENT SYSTEMS'2014, VOL 2: TOOLS, ARCHITECTURES, SYSTEMS, APPLICATIONS, 2015, 323 : 477 - 488
  • [43] A Study on Locational Marginal Prices based on Single-stage and Multi-stage Optimization Models
    Chen, Dayu
    Zhang, Lizi
    Chen, Zhixu
    Wang, Shu
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 2565 - +
  • [44] Multi-stage optimization method for air-intake system of hovercraft based on autonomous optimization
    Ren, Aoyu
    Sun, Haiou
    Wang, Zhongyi
    Yuan, Changlong
    JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2017, 40 (06) : 449 - 458
  • [45] Optimization of VD/VOD multi-stage serial steam ejectors based on CFD
    Amini, Reza
    Kheradmand, Saeid
    Rasoulimoghadam, Mehrdad
    IRONMAKING & STEELMAKING, 2023, 50 (06) : 599 - 612
  • [46] Multi-stage emergency medicine logistics system optimization based on survival probability
    Ke WANG
    Yixin LIANG
    Lindu ZHAO
    Frontiers of Engineering Management, 2017, 4 (02) : 221 - 228
  • [47] Multi-stage emergency medicine logistics system optimization based on survival probability
    Ke WANG
    Yixin LIANG
    Lindu ZHAO
    Frontiers of Engineering Management, 2017, (02) : 221 - 228
  • [48] Staging optimization of multi-stage perforation fracturing based on unsupervised machine learning
    Zhang D.
    Yu Y.
    Li S.
    Chen Y.
    Xu J.
    Zhongguo Shiyou Daxue Xuebao (Ziran Kexue Ban)/Journal of China University of Petroleum (Edition of Natural Science), 2021, 45 (04): : 59 - 66
  • [50] Research on multi-stage topology optimization method based on latent diffusion model
    Zhang, Wei
    Zhao, Guodong
    Su, Lijie
    ADVANCED ENGINEERING INFORMATICS, 2025, 63