Optimization-based available-to-promise with multi-stage resource availability

被引:56
|
作者
Zhao, ZY [1 ]
Ball, MO
Kotake, M
机构
[1] Univ Maryland, Robert H Smith Sch Business, College Pk, MD 20742 USA
[2] Univ Maryland, Syst Res Inst, College Pk, MD 20742 USA
[3] Toshiba Co Ltd, Corp Mfg Engn Ctr, Isogo Ku, Yokohama, Kanagawa 2350017, Japan
基金
美国国家科学基金会;
关键词
available-to-promise; manufacturing order; production capability; order-promising and fulfillment; mixed-integer-programming;
D O I
10.1007/s10479-005-6235-7
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Increasingly, customer service, rapid response to customer requirements, and flexibility to handle uncertainties in both demand and supply are becoming strategic differentiators in the marketplace. Organizations that want to achieve these benchmarks require sophisticated approaches to conduct order promising and fulfillment, especially in todays high-mix low-volume production environment. Motivated by these challenges, the Available-to-Promise (ATP) function has migrated from a set of availability records in a Master Production Schedule (MPS) toward an advanced real-time decision support system to enhance decision responsiveness and quality in Assembly To Order (ATO) or Configuration To Order (CTO) environments. Advanced ATP models and systems must directly link customer orders with various forms of available resources, including both material and production capacity. In this paper, we describe a set of enhancements carried out to adapt previously published mixed-integer-programming (MIP) models to the specific requirements posed by an electronic product supply chain within Toshiba Corporation. This model can provide individual order delivery quantities and due dates, together with production schedules, for a batch of customer orders that arrive within a predefined batching interval. The model considers multi-resource availability including manufacturing orders, production capability and production capacity. In addition, the model also takes into account a variety of realistic order promising issues such as order splitting, model decomposition and resource expediting and de-expediting. We conclude this paper with comparison of our model execution results vs. actual historical performance of systems currently in place.
引用
收藏
页码:65 / 85
页数:21
相关论文
共 50 条
  • [21] Available-To-Promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: An illustration of a ceramic case
    Alemany, M. M. E.
    Lario, Francisco-Cruz
    Ortiz, A.
    Gomez, F.
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (05) : 3380 - 3398
  • [22] A quantified multi-stage optimization method for resource allocation of electric grid defense planning
    Chen, Fan
    Wang, Ruichi
    Xu, Zheng
    Liu, Haitao
    Wang, Man
    ELECTRIC POWER SYSTEMS RESEARCH, 2023, 220
  • [23] Goal-based investing based on multi-stage robust portfolio optimization
    Jang Ho Kim
    Yongjae Lee
    Woo Chang Kim
    Frank J. Fabozzi
    Annals of Operations Research, 2022, 313 : 1141 - 1158
  • [24] Multi-stage multiform optimization for constrained multi-objective optimization
    Feng P.
    Ming F.
    Gong W.
    Neural Computing and Applications, 2024, 36 (23) : 14173 - 14235
  • [25] Goal-based investing based on multi-stage robust portfolio optimization
    Kim, Jang Ho
    Lee, Yongjae
    Kim, Woo Chang
    Fabozzi, Frank J.
    ANNALS OF OPERATIONS RESEARCH, 2022, 313 (02) : 1141 - 1158
  • [26] Multi objective optimization of ethanol production based on regional resource availability
    Dhanraj, Rashi
    Punnathanam, Varun
    Shastri, Yogendra
    SUSTAINABLE PRODUCTION AND CONSUMPTION, 2021, 27 : 1124 - 1137
  • [27] Design and optimization of multi-stage solid launch rocket based on integrated stage concept
    Gong, Chun-Lin
    Gu, Zhen-Fang
    Zhao, Ji-Song
    Gu, Liang-Xian
    Guo, Lin-Li
    Zhang, Qi
    Guti Huojian Jishu/Journal of Solid Rocket Technology, 2009, 32 (01): : 1 - 5
  • [28] Study on adjoint-based optimization method for multi-stage turbomachinery
    Weiwei Li
    Yong Tian
    Weilin Yi
    Lucheng Ji
    Weiwei Shao
    Yunhan Xiao
    Journal of Thermal Science, 2011, 20 : 398 - 405
  • [29] Optimization of multi-stage forging process based on the response surface methodology
    Liang, Yan-Qian
    Zhao, Zhen
    Wu, Yan-Jun
    Gao, Chong-Hui
    Hu, Cheng-Liang
    Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2009, 43 (05): : 713 - 716
  • [30] Multi-stage optimization placement of DPMUs based on node metric indices
    Lin, Junjie
    Chen, Haoyu
    Jiang, Changxu
    Han, Kunyu
    Wei, Xinchi
    Fang, Chen
    SUSTAINABLE ENERGY GRIDS & NETWORKS, 2024, 39