Project scheduling under partially renewable resources and resource consumption during setup operations

被引:28
|
作者
Okubo, Hironori [1 ]
Miyamoto, Toshiyuki [1 ]
Yoshida, Satoshi [1 ]
Mori, Kazuyuki [2 ]
Kitamura, Shoichi [2 ]
Izui, Yoshio [2 ]
机构
[1] Osaka Univ, Grad Sch Engn, Suita, Osaka 5650871, Japan
[2] Mitsubishi Electr Corp, Adv Technol R&D Ctr, Amagasaki, Hyogo 6618661, Japan
关键词
Project scheduling; Energy saving; RCPSP; Partially renewable resources; Setup operations; TARDINESS PENALTY; DECISION-SUPPORT; CONSTRAINT; ALGORITHM; CLASSIFICATION; OPTIMIZATION; MODEL;
D O I
10.1016/j.cie.2015.02.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
There has been an increasing pressure on manufacturing industries to reduce energy consumption. In this study, we propose a new variant of RCPSP called RCPSP/pi RC, which can deal with realistic energy constraints such as power restriction during peak hours, contract demand, and energy consumption during setup operations. First, we present an integer programming (IP) model and a constraint programming (CP) model of the RCPSP/pi RC. Next, we present a heuristic mode restriction method called a mask calculation algorithm to achieve efficient searching by restricting selectable modes. Finally, through computational experiments, we evaluate the proposed methods and show their effectiveness. (c) 2015 Elsevier Ltd. All rights reserved.