Scheduling operations for the harvesting of renewable resources

被引:22
|
作者
Foulds, LR
Wilson, JM
机构
[1] Univ Waikato, Dept Management Syst, Hamilton 2020, New Zealand
[2] Univ Loughborough, Sch Business, Loughborough, Leics, England
关键词
harvesting renewable resources; operations scheduling; case studies; integer programming; heuristics;
D O I
10.1016/j.jfoodeng.2003.12.009
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
We discuss the harvesting of renewable resources from an operations research scheduling viewpoint. We report on two practical harvesting case studies arising in agricultural contexts, based on practical data from commercial enterprises, involving minimum and maximum time lags and resource constraints. One of the case studies is concerned with the harvesting of rape seed in Australia and the other with hay harvesting in New Zealand. It appears that the scheduling of harvesting operations is a significantly different scenario from those represented by the scheduling models available in the literature. The differences come about because: the duration of each operation is dependent upon the combination of constrained resources allocated to it, individual worker-equipment allocation is restricted. and minimum or maximum time lags can be imposed. We report on harvesting operations scheduling models and solution procedures.. designed specifically for the case studies. The results represent significant improvements over the schedules that were traditionally used. The computational times experienced in solving general instances of the model of practical size by a commercial integer programming package are encouraging. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:281 / 292
页数:12
相关论文
共 50 条
  • [1] HARVESTING RENEWABLE RESOURCES
    BAINBRIDGE, GR
    [J]. ELECTRICAL REVIEW, 1975, 197 (07): : 217 - 219
  • [2] OPTIMAL HARVESTING OF RENEWABLE RESOURCES
    KOEN, C
    [J]. JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1988, 58 (01) : 83 - 91
  • [3] Project scheduling under partially renewable resources and resource consumption during setup operations
    Okubo, Hironori
    Miyamoto, Toshiyuki
    Yoshida, Satoshi
    Mori, Kazuyuki
    Kitamura, Shoichi
    Izui, Yoshio
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 83 : 91 - 99
  • [4] The assignment of individual renewable resources in scheduling
    Burdett, RL
    Kozan, E
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2004, 21 (03) : 355 - 377
  • [5] OPTIMAL HARVESTING POLICIES AND REGULATIONS FOR RENEWABLE RESOURCES
    SIMAAN, M
    TAKAYAMA, T
    [J]. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1980, 11 (03) : 281 - 290
  • [6] Production scheduling with discrete and renewable additional resources
    Kalinowski, K.
    Grabowik, C.
    Paprocka, I.
    Kempa, W.
    [J]. MODERN TECHNOLOGIES IN INDUSTRIAL ENGINEERING (MODTECH2015), 2015, 95
  • [7] Harvesting Renewable Resources of Population with Size Structure and Diffusion
    Xie, Qiang-Jun
    He, Ze-Rong
    Zhang, Chun-Guo
    [J]. ABSTRACT AND APPLIED ANALYSIS, 2014,
  • [8] HARVESTING AND REPLENISHMENT POLICIES FOR RENEWABLE NATURAL-RESOURCES
    DOUGLAS, AJ
    JOHNSON, RL
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 1993, 38 (01) : 27 - 42
  • [9] Operations scheduling with multiple resources and transportation considerations
    Lee, Kangbok
    Lei, Lei
    Pinedo, Michael
    Wang, Shengbin
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (23-24) : 7071 - 7090
  • [10] Scheduling the harvesting operations of a forest block: A case study
    Corner, JL
    Foulds, LR
    [J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2005, 22 (03) : 377 - 390