摘要
Historically, railway track maintenance strategies have been based on engineering judgement taking into account available budgets and operational safety. This has led to insufficient concern of the socio-economic and environmental costs and benefits of track maintenance. Given the pressure to increase track utilisation, the ageing infrastructure of railway networks, constrained maintenance budgets, the vertical separation of the ownership and operation of railway track infrastructure and rolling stock in many countries, and concerns about the environmental impacts of transport, there is a need to implement economically justifiable maintenance strategies. To this end, this paper presents for the first time an approach to appraise the investment in railway track maintenance. The approach uses a whole life cycle cost analysis under uncertainty approach which considers the costs and benefits of track maintenance to train operators, users and the environment. Monte Carlo simulation technique is used to address data uncertainties associated with the costs and benefits of track and train operation and maintenance. The proposed approach is applied to three different route types on the UK main-line railway network to compare a number of alternative maintenance strategies. In all the three cases more economically beneficial strategies were identified in comparison to those currently adopted.
引用
收藏
页数:17
相关论文
共 50 条
  • [11] TRACK MAINTENANCE AT THE END OF LIFE CYCLE
    Alduk, Waldemar
    Marenjak, Sasa
    ROAD AND RAIL INFRASTRUCTURE IV, 2016, : 687 - 693
  • [12] A method for assessing the life cycle costs of modifications to ballasted track systems
    Rempelos, Georgios
    Ortega, Alejandro
    Blainey, Simon
    Preston, John
    Le Pen, Louis
    Armstrong, John
    CONSTRUCTION AND BUILDING MATERIALS, 2020, 263
  • [13] A computational procedure for prediction of ballasted track profile degradation under railway traffic loading
    Nguyen, K.
    Villalmanzo, D. I.
    Goicolea, J. M.
    Gabaldon, F.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2016, 230 (08) : 1812 - 1827
  • [14] Analysis of Railway Ballasted Track Stiffness and Behavior with a Hybrid Discrete-Continuum Approach
    Shi, Can
    Zhao, Chunfa
    Yang, Yang
    Guo, Yunlong
    Zhang, Xu
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2021, 21 (03)
  • [15] Implementing slab track monoblock sleeper system for Indonesian urban metro railway project based on life cycle cost under uncertainty
    Usman, K.
    Ravianda, Y.
    Pramudita, H.
    Adrianto, R.
    5TH PLANOCOSMO INTERNATIONAL CONFERENCE INFRASTRUCTURE FOR ALL: SMART, INNOVATIVE, AND INCLUSIVE, 2020, 592
  • [16] Analysis of vehicle dynamic behavior under ballasted track irregularities in high-speed railway
    Cai, Xiaopei
    Zhao, Lining
    Lau, Albert Leong Lee
    Tan, Shiyu
    Cui, Rixin
    Noise and Vibration Worldwide, 2015, 46 (10): : 10 - 17
  • [17] Combined Discrete-Finite Element Modeling of Ballasted Railway Track Under Cyclic Loading
    Shao, S.
    Yan, Y.
    Ji, S.
    INTERNATIONAL JOURNAL OF COMPUTATIONAL METHODS, 2017, 14 (05)
  • [18] Experimental settlement and dynamic behavior of a portion of ballasted railway track under high speed trains
    Al Shaer, A.
    Duhamel, D.
    Sab, K.
    Foret, G.
    Schmitt, L.
    JOURNAL OF SOUND AND VIBRATION, 2008, 316 (1-5) : 211 - 233
  • [19] Optimisation model to schedule railway track renewal operations: a life-cycle cost approach
    Caetano, Luis Filipe
    Teixeira, Paulo Fonseca
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2015, 11 (11) : 1524 - 1536
  • [20] Life cycle cost assessment of bitumen stabilised ballast: A novel maintenance strategy for railway track-bed
    Giunta, Marinella
    Bressi, Sara
    D'Angelo, Giacomo
    CONSTRUCTION AND BUILDING MATERIALS, 2018, 172 : 751 - 759