Life cycle cost assessment of bitumen stabilised ballast: A novel maintenance strategy for railway track-bed

被引:35
|
作者
Giunta, Marinella [1 ]
Bressi, Sara [2 ]
D'Angelo, Giacomo [3 ]
机构
[1] Univ Mediterranea Reggio Calabria, Dept Civil Energy Environm & Mat Engn DICEAM, Reggio Di Calabria, Italy
[2] Univ Pisa, Dept Civil & Ind Engn DICE, Pisa, Italy
[3] Pavement Design & Asset Management, Milan, Italy
关键词
Bitumen stabilised ballast; Traditional ballast; Lifecycle cost; Maintenance; Railway track-bed;
D O I
10.1016/j.conbuildmat.2018.04.020
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In railway sector, the high quality of the track is ensured by adequate construction methods and frequent maintenance. To reduce the maintenance frequency diverse techniques have been recently developed. Among others, bitumen stabilised ballast (BSB) represents an innovative solution designed to increase ballast service life and reduce overall maintenance burdens. This technology, which can be used for new track-beds as well as to reinforce existing ones, consists of the use of bitumen emulsion (BE) poured or sprayed at ambient temperature onto the ballast. The objective of the present work is to assess the economic feasibility, encompassing the estimation of the costs of the environmental impacts, of this innovative technology (BSB), compared to the traditional ballast (TB). This purpose is achieved using a lifecycle approach where economic and environmental impacts are combined to return an integrated model. Results of Life Cycle Cost Assessment carried out for the baseline scenarios (with respect to traffic level and quality level set for the infrastructure) indicated that: the BSB technology, used since the construction stage and during the routine tamping, can provide economical savings. Sensitivity analysis to main parameters affecting results showed that these savings can vary significantly, especially in relation to the traffic and the discount rate. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:751 / 759
页数:9
相关论文
共 50 条
  • [1] Environmental performance analysis of bitumen stabilized ballast for railway track-bed using life-cycle assessment
    Bressi, Sara
    D'Angelo, Giacomo
    Santos, Joao
    Giunta, Marinella
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2018, 188 : 1050 - 1064
  • [2] Bitumen stabilized ballast: A potential solution for railway track-bed
    D'Angelo, Giacomo
    Thom, Nicholas
    Lo Presti, Davide
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2016, 124 : 118 - 126
  • [3] Novel performance-based technique for predicting maintenance strategy of bitumen stabilised ballast
    D'Angelo, Giacomo
    Bressi, Sara
    Giunta, Marinella
    Lo Presti, Davide
    Thom, Nick
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2018, 161 : 1 - 8
  • [4] Use of bitumen-stabilised ballast for improving railway trackbed conventional maintenance
    D'Angelo, G.
    Sol-Sanchez, M.
    Moreno-Navarro, F.
    Lo Presti, D.
    Thom, N.
    [J]. GEOTECHNIQUE, 2018, 68 (06): : 518 - 527
  • [5] Geotechnical auscultation of a French conventional railway track-bed for maintenance purposes
    Lamas-Lopez, F.
    Cui, Y. J.
    D'Aguiar, S. Costa
    Calon, N.
    [J]. SOILS AND FOUNDATIONS, 2016, 56 (02) : 240 - 250
  • [6] Uncertainty in Life Cycle Cost of Railway Track
    Patra, Ambika Prasad
    Soderholm, Peter
    Kumar, Uday
    [J]. ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2008 PROCEEDINGS, 2008, : 44 - +
  • [7] Optimization of maintenance strategies for railway track-bed considering probabilistic degradation models and different reliability levels
    Bressi, Sara
    Santos, Joao
    Losa, Massimo
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 207
  • [8] SUSTAINABILITY IN RAILWAY CONSTRUCTION: LCA-LCC BASED ASSESSMENT OF ALTERNATIVE SOLUTIONS FOR TRACK-BED
    Giunta, Marinella
    Bressi, Sara
    Losa, Massimo
    [J]. PROCEEDINGS OF THE JOINT RAIL CONFERENCE (JRC2020), 2020,
  • [9] Estimation of the life cycle cost of the upper railway track structure
    Karpuschenko, Nikolai
    Trukhanov, Pavel
    [J]. X INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE POLYTRANSPORT SYSTEMS, 2018, 216
  • [10] LIFE CYCLE COST ANALYSIS FOR REINFORCED GEOGRID RAILWAY TRACK
    Alabdullah, Saad Farhan Ibrahim
    Kadhim, Ali Jabbar
    Khalaf, Harith Basim
    [J]. INTERNATIONAL JOURNAL OF GEOMATE, 2020, 19 (75): : 191 - 196