Optimisation model to schedule railway track renewal operations: a life-cycle cost approach

被引:58
|
作者
Caetano, Luis Filipe [1 ]
Teixeira, Paulo Fonseca [1 ]
机构
[1] Univ Lisbon, IST, P-1049001 Lisbon, Portugal
关键词
railway track; opportunistic renewal scheduling; life-cycle cost assessment; optimisation; UNCERTAINTY; INSPECTION; SLEEPERS; WEAR;
D O I
10.1080/15732479.2014.982133
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Besides high initial construction costs, ballasted railway tracks also have high investment requirements, related to maintenance and renewal (M&R) works. Decision support tools for railway track components that optimise these works are increasingly gaining in importance. This paper presents an optimisation model that integrates ballast, rail and sleeper degradation models in a mixed integer linear programming model. This model links the decisions to renew these components with their condition and takes advantage of the integrated planning of renewal works to minimise the railway track life-cycle cost (LCC). The practical utility of the model is illustrated with a case study involving the Portuguese Lisbon-Porto line. The results indicate a reduction in track renewal cost if the grouping of components, track segments and time interval for renewal operations are optimised. Furthermore, this paper demonstrates that possible annual budget restrictions for railway track M&R operations can have an important influence on the railway track LCC.
引用
收藏
页码:1524 / 1536
页数:13
相关论文
共 50 条
  • [1] Availability Approach to Optimizing Railway Track Renewal Operations
    Caetano, Luis Filipe
    Teixeira, Paulo Fonseca
    JOURNAL OF TRANSPORTATION ENGINEERING, 2013, 139 (09) : 941 - 948
  • [2] Environmental life-cycle assessment of railway track beds
    Kiani, M.
    Parry, T.
    Ceney, H.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2008, 161 (02) : 135 - 142
  • [3] Life-cycle cost analysis based on a renewal model of earthquake occurrences
    Takahashi, Y
    Kiureghian, AD
    Ang, AHS
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2004, 33 (07): : 859 - 880
  • [4] Uncertainty in Life Cycle Cost of Railway Track
    Patra, Ambika Prasad
    Soderholm, Peter
    Kumar, Uday
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2008 PROCEEDINGS, 2008, : 44 - +
  • [5] LIFE-CYCLE COST - A MODEL AND APPLICATIONS
    HEDGE, GG
    IIE TRANSACTIONS, 1994, 26 (06) : 56 - 62
  • [6] Measurement Data-Driven Life-Cycle Management of Railway Track
    Neuhold, Johannes
    Landgraf, Matthias
    Marschnig, Stefan
    Veit, Peter
    TRANSPORTATION RESEARCH RECORD, 2020, 2674 (11) : 685 - 696
  • [7] Life-Cycle Cost Model of High-Speed Railway Considering Carbon Emissions
    Wang, Xingju
    Liu, Jiayu
    Long, Fenjie
    Lu, Pan
    Ren, Yihao
    Chen, Jinjie
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2023, 29 (03)
  • [8] Estimation of the life cycle cost of the upper railway track structure
    Karpuschenko, Nikolai
    Trukhanov, Pavel
    X INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE POLYTRANSPORT SYSTEMS, 2018, 216
  • [9] LIFE CYCLE COST ANALYSIS FOR REINFORCED GEOGRID RAILWAY TRACK
    Alabdullah, Saad Farhan Ibrahim
    Kadhim, Ali Jabbar
    Khalaf, Harith Basim
    INTERNATIONAL JOURNAL OF GEOMATE, 2020, 19 (75): : 191 - 196
  • [10] Strategic Model to Optimize Railway-Track Renewal Operations at a Network Level
    Caetano, Luis Filipe
    Teixeira, Paulo Fonseca
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (02)