Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type

被引:45
|
作者
Irfan, Muhammad [1 ]
Khurshid, Muhammad Bilal [2 ]
Anastasopoulos, Panagiotis [3 ]
Labi, Samuel [4 ]
Moavenzadeh, Fred [5 ]
机构
[1] NUST, SCEE, NIT, Islamabad 44000, Pakistan
[2] NUST, MCE, Risalpur, Pakistan
[3] Purdue Univ, CRS, W Lafayette, IN 47907 USA
[4] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
[5] MIT, Sch Civil & Environm Engn, Cambridge, MA 02139 USA
关键词
Project management; Transport; Engineering and construction; North America; CONSTRUCTION PROJECTS; TIME; DELAYS;
D O I
10.1016/j.ijproman.2010.01.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
At the planning phase of project development, highway agencies seek to estimate the time duration of project implementation for purposes such as construction planning, contract administration, and workzone impact assessments. This paper investigates the estimation of highway project duration on the basis of variables known at the planning phase such as planned cost and project type, and contract type. Project types are pavement construction, rehabilitation, maintenance, traffic facility installation, and bridge construction. The contract types considered are fixed-duration and fixed-deadline contracts. Using a variety of model specifications, the paper presents mathematical relationships between highway project duration and the magnitude of the planned cost and project type, and contract type. The paper shows that all other factors remaining the same, the duration of fixed-date deadline contracts generally exceed that of fixed-duration contracts; and higher levels of planned cost translate non-linearly into greater project duration. The developed models can help project administrators provide improved estimates of project duration and thus could help reduce project time delays. Also, the models are useful in forecasting workzone durations, a key aspect of workzone user cost estimation. (c) 2010 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:78 / 92
页数:15
相关论文
共 47 条
  • [41] Combined supply of heat and refrigeration for a large-scale project incorporating steam generators and two-stage absorption-type refrigeration systems
    Pfeiffenberger, U.
    Gaswaerme International, 45 (02): : 76 - 80
  • [42] Type and duration of emergency recovery work and its longitudinal effects on mental health symptoms among Fukushima Daiichi Nuclear Power Plant workers: The Fukushima NEWS project study
    Tajima, Tomokazu
    Ikeda, Ai
    Kawachi, Ichiro
    Kono, Tomotaka
    Wada, Hiroo
    Shigemura, Jun
    Tanigawa, Takeshi
    JOURNAL OF PSYCHIATRIC RESEARCH, 2021, 143 : 68 - 74
  • [43] EXTRANODAL NK/T-CELL LYMPHOMA, NASAL TYPE OF ADVANCED STAGE: NKEA (NEXT-GENERATION THERAPY FOR NK/T-CELL LYMPHOMA IN EAST ASIA) PROJECT
    Suzuki, R.
    Yamaguchi, M.
    Oguchi, M.
    Asano, N.
    Tomita, N.
    Amaki, J.
    Ando, T.
    Niitsu, N.
    Sekiguchi, N.
    Takizawa, J.
    Miyazaki, K.
    Katayama, N.
    HAEMATOLOGICA, 2016, 101 : 388 - 389
  • [44] Control of microstructure and atomic arrangement by laser-type metal additive manufacturing; SIP (1st stage, 2nd stage) projects and METI regional new growth industry creation promotion subsidy project
    SIP 第 1 期・SIP 第 2 期・経産省地域新成長産業創出促進事業:レーザ金属Additive Manufacturing による材料組織ならびに原子配列制御
    Nakano, Takayoshi, 1600, Japan Welding Society (89): : 27 - 37
  • [45] Rationale and design of the PREDICE project: cost-effectiveness of type 2 diabetes prevention among high-risk Spanish individuals following lifestyle intervention in real-life primary care setting
    Bernardo Costa
    Joan J Cabré
    Ramon Sagarra
    Oriol Solà-Morales
    Francisco Barrio
    Josep L Piñol
    Xavier Cos
    Bonaventura Bolíbar
    Conxa Castell
    Katarzyna Kissimova-Skarbek
    Jaakko Tuomilehto
    BMC Public Health, 11
  • [46] Rationale and design of the PREDICE project: cost-effectiveness of type 2 diabetes prevention among high-risk Spanish individuals following lifestyle intervention in real-life primary care setting
    Costa, Bernardo
    Cabre, Joan J.
    Sagarra, Ramon
    Sola-Morales, Oriol
    Barrio, Francisco
    Pinol, Josep L.
    Cos, Xavier
    Bolibar, Bonaventura
    Castell, Conxa
    Kissimova-Skarbek, Katarzyna
    Tuomilehto, Jaakko
    BMC PUBLIC HEALTH, 2011, 11
  • [47] A new qualitative and quantitative analytical approach for risk management in energy project time-cost trade-off problem under interval type-2 fuzzy uncertainty: A case study in the gas industry
    Haghighi, Mohammad Hossein
    Ashrafi, Maryam
    ENERGY REPORTS, 2022, 8 : 12668 - 12685