共 47 条
- [23] Research Project Planning Based on SCRUM Framework and Type-2 Fuzzy Numbers INFORMATION SYSTEMS ARCHITECTURE AND TECHNOLOGY, ISAT 2018, PT III, 2019, 854 : 381 - 391
- [24] Company-wide project management: the planning and control of programmes of projects of different type International Journal of Project Management, 1999, 17 (01): : 55 - 59
- [25] A Study on the Algorithm of Cash Flow Forecasting Model Using the Cost Categories in the Planning Stage of a Construction Project INTERNATIONAL CONFERENCE ON ADVANCES IN MANAGEMENT SCIENCE AND ENGINEERING (AMSE 2015), 2015, : 150 - 154
- [27] Development of WBS (Work Breakdown Structure) Risk Based Standard for Planning Cost Estimation at Port Project INTERNATIONAL CONFERENCE ON SCIENCE, INFRASTRUCTURE TECHNOLOGY AND REGIONAL DEVELOPMENT, 2019, 258
- [28] The project 21 smart product model: A new paradigm for ship design, cost estimation, and production planning Journal of Ship Production, 2002, 18 (02): : 73 - 78
- [29] Investigating the Effect of Software Project Type on Accuracy of Software Development Effort Estimation in COCOMO Model FOURTH INTERNATIONAL CONFERENCE ON MACHINE VISION (ICMV 2011): COMPUTER VISION AND IMAGE ANALYSIS: PATTERN RECOGNITION AND BASIC TECHNOLOGIES, 2012, 8350