共 47 条
- [31] Clinical and Cost Implications of Insulin Degludec in Patients with Type 1 Diabetes and Problematic Hypoglycemia: A Quality Improvement Project Diabetes Therapy, 2018, 9 : 839 - 849
- [32] Largest-sized slurry type shield tunneling through extremely soft ground: Trans-Tokyo Bay Highway project CHALLENGES FOR THE 21ST CENTURY, VOL. 2: COMMUNICATION TUNNELS/MISCELLANEOUS INCLUDING WATER TUNNELS/MECHANISED TUNNELLING, 1999, : 929 - 936
- [39] Does Payer Type Influence Pediatric Burn Outcomes? A National Study Using the Healthcare Cost and Utilization Project Kids' Inpatient Database JOURNAL OF BURN CARE & RESEARCH, 2016, 37 (05): : 314 - 320
- [40] CONSTRUCTION OF REINFORCED-CONCRETE MULTISTORY OFFICE BUILDINGS - A SIMULATION-MODEL FOR TIME COST CALCULATIONS - FIRST STAGE COMPUTER-SIMULATION MODEL FOR THE DURATION AND COST ESTIMATION OF THE CONSTRUCTION OF A TYPICAL MULTISTORY CONCRETE FRAMED OFFICE BUILDING PROVIDING RAPID RESPONSE TO CHANGES IN INPUT VALUES AND THEIR EFFECT ON THE DURATION AND COST OF THE PROJECT BUILDING RESEARCH AND INFORMATION, 1995, 23 (04): : 227 - 233