Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type

被引:45
|
作者
Irfan, Muhammad [1 ]
Khurshid, Muhammad Bilal [2 ]
Anastasopoulos, Panagiotis [3 ]
Labi, Samuel [4 ]
Moavenzadeh, Fred [5 ]
机构
[1] NUST, SCEE, NIT, Islamabad 44000, Pakistan
[2] NUST, MCE, Risalpur, Pakistan
[3] Purdue Univ, CRS, W Lafayette, IN 47907 USA
[4] Purdue Univ, Sch Civil Engn, W Lafayette, IN 47907 USA
[5] MIT, Sch Civil & Environm Engn, Cambridge, MA 02139 USA
关键词
Project management; Transport; Engineering and construction; North America; CONSTRUCTION PROJECTS; TIME; DELAYS;
D O I
10.1016/j.ijproman.2010.01.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
At the planning phase of project development, highway agencies seek to estimate the time duration of project implementation for purposes such as construction planning, contract administration, and workzone impact assessments. This paper investigates the estimation of highway project duration on the basis of variables known at the planning phase such as planned cost and project type, and contract type. Project types are pavement construction, rehabilitation, maintenance, traffic facility installation, and bridge construction. The contract types considered are fixed-duration and fixed-deadline contracts. Using a variety of model specifications, the paper presents mathematical relationships between highway project duration and the magnitude of the planned cost and project type, and contract type. The paper shows that all other factors remaining the same, the duration of fixed-date deadline contracts generally exceed that of fixed-duration contracts; and higher levels of planned cost translate non-linearly into greater project duration. The developed models can help project administrators provide improved estimates of project duration and thus could help reduce project time delays. Also, the models are useful in forecasting workzone durations, a key aspect of workzone user cost estimation. (c) 2010 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:78 / 92
页数:15
相关论文
共 47 条
  • [1] Determining Highway Project Contract Time from Project Duration Estimates
    Le, Chau
    Jeong, H. David
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [2] Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods
    Antoine, Arthur L. C.
    Alleman, Douglas
    Molenaar, Keith R.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)
  • [3] Enhanced Highway Project Clustering Framework to Support Project Cost Estimation
    Do, Quan
    Moriyani, Muhammad Ali
    Le, Tuyen
    Le, Chau
    Piratla, Kalyan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2025, 151 (01)
  • [4] Influence of Highway Project Characteristics on Contract Type Selection: Empirical Assessment
    Anastasopoulos, Panagiotis Ch
    Labi, Samuel
    McCullouch, Bob G.
    Karlaftis, Matthew G.
    Moavenzadeh, Fred
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2010, 16 (04) : 323 - 333
  • [5] Reported project management effort, project size, and contract type
    Ahonen, Jarmo J.
    Savolainen, Paula
    Merikoski, Helena
    Nevalainen, Jaana
    JOURNAL OF SYSTEMS AND SOFTWARE, 2015, 109 : 205 - 213
  • [6] PROJECT PLANNING AS A TYPE OF ACTIVITY
    Roslyakov, A. E.
    RUDN JOURNAL OF SOCIOLOGY-VESTNIK ROSSIISKOGO UNIVERSITETA DRUZHBY NARODOV SERIYA SOTSIOLOGIYA, 2010, (01): : 27 - 33
  • [7] Estimation of Highway Project Cost using Probabilistic Technique
    Hannan, Abdul
    Ahmed, Anwaar
    Ashraf, Tabjeel
    Bai, Qiang
    ADVANCES OF TRANSPORTATION: INFRASTRUCTURE AND MATERIALS, VOL 1, 2016, : 423 - 430
  • [8] A simplified approach to the planning and control of cost and project duration
    Cusack, M.M.
    Construction Management and Economics, 1985, 3 (03) : 183 - 198
  • [9] Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance
    Moon, Hyosoo
    Park, Moonseo
    Ahn, Yonghan
    Kwon, Nahyun
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (01)
  • [10] A study on analysis of the environmental load impact factors in the planning stage for highway project
    Park, Jin-Young
    Lee, Dong-Eun
    Kim, Byung-Soo
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (06) : 2162 - 2169