BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT

被引:1
|
作者
Bhatti, Imtiaz Ali [1 ]
Abdullah, Abd Halid [1 ]
Nagapan, Sasitharan [1 ]
Bhatti, Nabi Bux [2 ]
Lakhiar, Muhammad Tahir [3 ]
Mahar, Muntazir Mahdi [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia Pant Raja, Fac Civil & Environm Engn, Johor Baharu, Malaysia
[2] Mehran Univ Engn & Technol, US Pakistan Ctr Adv Studies Water, Sindh, Pakistan
[3] Natl Univ Sci & Technol, Dept Civil Engn, Quetta Campus, Balouchistan, Pakistan
关键词
Construction; Production; Cost of Labour; building project; weather conditions; target quantity;
D O I
10.2478/jaes-2019-0017
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis labour utilizes 30% of time on productive activities rest 70% of the time is ruined in non-productive activities, there are multi factors which are affecting the labour production in construction industry hence this study provides an overview of productivity, Total Factor productivity, method used to measure accurate productivity in construction projects. The objective of this study is find out percentage up to what extent labour production is affected due to weather conditions, however this study is carried out in arid climate region in Month of June 2018, where minimum temperature was recorded 26.0 Celsius degree at 7:30 AM and Maximum was 47.80 Celsius degree at 3:00 PM. A descriptive survey research design approach was adopted using continuous observation method of study. Project work study manual served as the research instrument to collect the data on selected building sites for 30 working days. Data collected were analyzed using descriptive statics. The results show that average monthly production of mason gang was recorded with less production of 28.759%, Carpentry gang with average monthly loss of production 16.74% & steel fixer gang had average monthly loss of production was 12.188. This concludes that prior to signing the contract for construction project. The location, environment, topography of region, capacity of construction operatives must be kept in mind to decide the proper timeline for the successful of project.
引用
收藏
页码:125 / 130
页数:6
相关论文
共 50 条
  • [31] Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices
    Manoharan, Kesavan
    Dissanayake, Pujitha
    Pathirana, Chintha
    Deegahawature, Dharsana
    Silva, Renuka
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2024, 24 (02): : 558 - 583
  • [32] Identifying factors affecting construction labour productivity in India and measures to improve productivity
    Agrawal A.
    Halder S.
    [J]. Asian Journal of Civil Engineering, 2020, 21 (4) : 569 - 579
  • [33] Analysis of Labour Environment Factors Impacting the Productivity of Employees
    Bite, Ligita
    Muska, Aina
    [J]. ECONOMIC SCIENCE FOR RURAL DEVELOPMENT: RESOURCES AND EDUCATION, 2010, (22): : 25 - 32
  • [34] COMPARISON OF LABOUR PRODUCTIVITY AND AVERAGE WAGES IN A GLOBALIZED ENVIRONMENT
    Buno, Martin
    Kovacikova, Martina
    [J]. GLOBALIZATION AND ITS SOCIO-ECONOMIC CONSEQUENCES, PTS I - VI, 2017, : 226 - 233
  • [35] UNIONIZATION AND PRODUCTIVITY IN OFFICE BUILDING AND SCHOOL CONSTRUCTION
    ALLEN, SG
    [J]. INDUSTRIAL & LABOR RELATIONS REVIEW, 1986, 39 (02): : 187 - 201
  • [36] AN OBSERVATIONAL STUDY OF THE PRODUCTIVITY OF FORMWORK IN BUILDING CONSTRUCTION
    Mine, Naoto
    Wai, Soon Han
    Lim, Ting Chuan
    [J]. IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 1127 - 1132
  • [37] Multi-parameter analysis of different building forms in a semi-arid climate: Effect of building construction and phase change materials
    Laasri, Imad Ait
    Outzourhit, Abdelkader
    Mghazli, Mohamed Oualid
    [J]. SOLAR ENERGY, 2023, 250 : 220 - 240
  • [38] Buildability factors affecting formwork labour productivity of building floors
    Jarkas, Abdulaziz M.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (10) : 1383 - 1394
  • [39] Factors affecting labour productivity in building projects in the Gaza strip
    School of Civil Engineering, Islamic University of Gaza, P.O. Box 108, Gaza, Ps
    不详
    不详
    [J]. J. Civ. Eng. Manage., 2007, 4 (245-254):
  • [40] Building Hong Kong: Nepalese labour in the construction sector
    Frost, S