BUILDING CONSTRUCTION LABOUR PRODUCTIVITY IN ARID CLIMATE ENVIRONMENT

被引:1
|
作者
Bhatti, Imtiaz Ali [1 ]
Abdullah, Abd Halid [1 ]
Nagapan, Sasitharan [1 ]
Bhatti, Nabi Bux [2 ]
Lakhiar, Muhammad Tahir [3 ]
Mahar, Muntazir Mahdi [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia Pant Raja, Fac Civil & Environm Engn, Johor Baharu, Malaysia
[2] Mehran Univ Engn & Technol, US Pakistan Ctr Adv Studies Water, Sindh, Pakistan
[3] Natl Univ Sci & Technol, Dept Civil Engn, Quetta Campus, Balouchistan, Pakistan
关键词
Construction; Production; Cost of Labour; building project; weather conditions; target quantity;
D O I
10.2478/jaes-2019-0017
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Productivity is a significant aspect of construction industry that plays vital role for success and failure of any construction project. This industry generates 11% to 13% of GDP all around the globe and the cost of labour in any building project is 20% to 35% of the cost of Building. On daily basis labour utilizes 30% of time on productive activities rest 70% of the time is ruined in non-productive activities, there are multi factors which are affecting the labour production in construction industry hence this study provides an overview of productivity, Total Factor productivity, method used to measure accurate productivity in construction projects. The objective of this study is find out percentage up to what extent labour production is affected due to weather conditions, however this study is carried out in arid climate region in Month of June 2018, where minimum temperature was recorded 26.0 Celsius degree at 7:30 AM and Maximum was 47.80 Celsius degree at 3:00 PM. A descriptive survey research design approach was adopted using continuous observation method of study. Project work study manual served as the research instrument to collect the data on selected building sites for 30 working days. Data collected were analyzed using descriptive statics. The results show that average monthly production of mason gang was recorded with less production of 28.759%, Carpentry gang with average monthly loss of production 16.74% & steel fixer gang had average monthly loss of production was 12.188. This concludes that prior to signing the contract for construction project. The location, environment, topography of region, capacity of construction operatives must be kept in mind to decide the proper timeline for the successful of project.
引用
收藏
页码:125 / 130
页数:6
相关论文
共 50 条
  • [21] Conceptual Framework Factors Affecting Construction Labour Productivity
    Nurhendi, Revianty Nurmeyliandari
    Khoiry, Muhamad Azry
    Hamzah, Noraini
    [J]. JURNAL KEJURUTERAAN, 2022, 34 (01): : 89 - 99
  • [22] Construction process performance variability: Focus on labour productivity
    Lema, NM
    Price, ADF
    [J]. BUILDING RESEARCH AND INFORMATION, 1996, 24 (06): : 339 - 350
  • [23] Impact of Globalization on Labour Productivity in the Malaysian Construction Sector
    Ismail, Rahmah
    Yuliyusman, Ferayuliani
    [J]. LIFE SCIENCE JOURNAL-ACTA ZHENGZHOU UNIVERSITY OVERSEAS EDITION, 2012, 9 (04): : 3235 - 3242
  • [24] Impact of weather conditions on construction labour productivity in Qatar
    Senouci, Ahmed
    Al-Abbasi, Mohammed
    Eldin, Neil N.
    [J]. MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (01) : 34 - 49
  • [25] A scientometric analysis and review of construction labour productivity research
    Adebowale, Oluseyi Julius
    Agumba, Justus Ngala
    [J]. INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2023, 72 (07) : 1903 - 1923
  • [26] International comparisons of nominal and real construction labour productivity
    Chia, Fah Choy
    Skitmore, Martin
    Gray, Jason
    Bridge, Adrian
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (07) : 896 - 915
  • [27] Commute and Labour Productivity: Inner City Construction Sites
    Chaparro, Daniel Alejandro
    Ying, Fei
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: SAFETY, WORKFORCE, AND EDUCATION, 2020, : 239 - 249
  • [28] Construction SMEs labour productivity: causal layered analysis
    Adebowale, Oluseyi Julius
    Agumba, Justus Ngala
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023,
  • [29] Impact of labour productivity in estimating the duration of construction projects
    Selvam, Gopinath
    Madhavi, T. Ch.
    Naazeema Begum, T. P.
    Sudheesh, Monish
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (12) : 2398 - 2404
  • [30] Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices
    Manoharan, Kesavan
    Dissanayake, Pujitha
    Pathirana, Chintha
    Deegahawature, Dharsana
    Silva, Renuka
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2024, 24 (02): : 558 - 583