An adaptive memory programming framework for the resource-constrained project scheduling problem

被引:7
|
作者
Paraskevopoulos, Dimitris C. [1 ]
Tarantilis, Christos D. [2 ]
Ioannou, George [2 ]
机构
[1] Univ Bath, Sch Management, Bath, Avon, England
[2] Athens Univ Econ & Business, Dept Management Sci & Technol, Athens, Greece
关键词
adaptive memory programming; project scheduling; resource constraints; VEHICLE-ROUTING PROBLEM; GENETIC ALGORITHM; TABU SEARCH; OPTIMIZATION;
D O I
10.1080/00207543.2016.1145814
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Resource-Constrained Project Scheduling Problem (RCPSP) is one of the most intractable combinatorial optimisation problems that combines a set of constraints and objectives met in a vast variety of applications and industries. Its solution raises major theoretical challenges due to its complexity, yet presenting numerous practical dimensions. Adaptive memory programming (AMP) is one of the most successful frameworks for solving hard combinatorial optimisation problems (e.g. vehicle routing and scheduling). Its success stems from the use of learning mechanisms that capture favourable solution elements found in high-quality solutions. This paper challenges the efficiency of AMP for solving the RCPSP, to our knowledge, for the first time in the literature. Computational experiments on well-known benchmark RCPSP instances show that the proposed AMP consistently produces high-quality solutions in reasonable computational times.
引用
收藏
页码:4938 / 4956
页数:19
相关论文
共 50 条
  • [21] An evolution programme for the resource-constrained project scheduling problem
    Cheng, RW
    Gen, M
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1998, 11 (03) : 274 - 287
  • [22] A hybrid metaheuristic for the resource-constrained project scheduling problem
    Tseng, Lin-Yu
    Chen, Shih-Chieh
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 175 (02) : 707 - 721
  • [23] Genetic algorithm for the resource-constrained project scheduling problem
    Goncharov, E. N.
    Leonov, V. V.
    AUTOMATION AND REMOTE CONTROL, 2017, 78 (06) : 1101 - 1114
  • [24] A multiobjective resource-constrained project-scheduling problem
    Ben Abdelaziz, Fouad
    Krichen, Saoussen
    Dridi, Olfa
    SYMBOLIC AND QUANTITATIVE APPROACHES TO REASONING WITH UNCERTAINTY, PROCEEDINGS, 2007, 4724 : 719 - +
  • [25] On the summary measures for the resource-constrained project scheduling problem
    Van Eynde, Rob
    Vanhoucke, Mario
    Coelho, Jose
    ANNALS OF OPERATIONS RESEARCH, 2024, 337 (02) : 593 - 625
  • [26] Evaluation of Heuristics for a Resource-Constrained Project Scheduling Problem
    Zhong, Shisheng
    Fu, Xuyun
    Lin, Lin
    Wang, Guolei
    MACHINING AND ADVANCED MANUFACTURING TECHNOLOGY X, 2010, 431-432 : 122 - 125
  • [27] The proactive and reactive resource-constrained project scheduling problem
    Davari, Morteza
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2019, 22 (02) : 211 - 237
  • [28] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247
  • [29] A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
    Berthold, Timo
    Heinz, Stefan
    Luebbecke, Marco E.
    Moehring, Rolf H.
    Schulz, Jens
    INTEGRATION OF AI AND OR TECHNIQUES IN CONSTRAINT PROGRAMMING FOR COMBINATORIAL OPTIMIZATION PROBLEMS, 2010, 6140 : 313 - +
  • [30] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036