Optimal Black Start Allocation for Power System Restoration

被引:84
|
作者
Patsakis, Georgios [1 ,2 ]
Rajan, Deepak [3 ]
Aravena, Ignacio [4 ]
Rios, Jennifer [5 ]
Oren, Shmuel [1 ,2 ]
机构
[1] Univ Calif Berkeley, Dept Ind Engn & Operat Res, Berkeley, CA 94720 USA
[2] Univ Calif Berkeley, Tsinghua Berkeley Shenzhen Inst, Berkeley, CA 94720 USA
[3] Lawrence Livermore Natl Lab, Livermore, CA 94551 USA
[4] UC Louvain, Ctr Operat Res & Econometr, B-1348 Louvain La Neuve, Belgium
[5] Pacific Gas & Elect Co PG&E, San Francisco, CA 94110 USA
关键词
Black start allocation; power system restoration; mixed integer programming; NERC compliance; OPTIMIZATION;
D O I
10.1109/TPWRS.2018.2839610
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. We proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.
引用
收藏
页码:6766 / 6776
页数:11
相关论文
共 50 条
  • [41] System Restoration using VSC-HVDC connected Offshore Wind Power Plant as Black-Start Unit
    Becker, Holger
    Naranovich, Akim
    Hennig, Tobias
    Akbulut, Alev
    Mende, Denis
    Stock, Sebastian
    Hofmann, Lutz
    2017 19TH EUROPEAN CONFERENCE ON POWER ELECTRONICS AND APPLICATIONS (EPE'17 ECCE EUROPE), 2017,
  • [42] Multiobjective Optimal Service Restoration for Shipboard Power System
    Huang Jing
    Zhang Xiaofeng
    Chen Yan
    2009 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTING AND INTELLIGENT SYSTEMS, PROCEEDINGS, VOL 1, 2009, : 644 - +
  • [43] Optimal TCSC Allocation in a Power System for Risk Minimization
    Shchetinin, Dmitry
    Hug, Gabriela
    2014 NORTH AMERICAN POWER SYMPOSIUM (NAPS), 2014,
  • [44] OPTIMAL POWER ALLOCATION FOR AN ENERGY HARVESTING ESTIMATION SYSTEM
    Zhao, Yu
    Chen, Biao
    Zhang, Rui
    2013 IEEE INTERNATIONAL CONFERENCE ON ACOUSTICS, SPEECH AND SIGNAL PROCESSING (ICASSP), 2013, : 4549 - 4553
  • [45] OPTIMAL REACTIVE POWER ALLOCATION FOR IMPROVED SYSTEM PERFORMANCE
    IYER, SR
    RAMACHANDRAN, K
    HARIHARAN, S
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1984, 103 (06): : 1509 - 1515
  • [46] Optimal reserved water of pumped storage power station for black-start
    Wang, Chunyi
    Liu, Yutian
    He, Baoling
    Qiu, Xizhao
    Mu, Hong
    Zhou, Wenjun
    Xu, Gang
    2007 CONFERENCE PROCEEDINGS IPEC, VOLS 1-3, 2007, : 945 - +
  • [47] Optimal reactive power allocation for power system transfer capability assessment
    Goh, S. H.
    Saha, T. K.
    Dong, Z. Y.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 2528 - +
  • [48] New Approach for the Optimal Allocation of Wind Power in a Rural Power System
    Su Youli
    JOURNAL OF ENERGY ENGINEERING, 2016, 142 (03)
  • [49] Allocation of synchronous condensers for restoration of system short-circuit power
    Marrazi, Emanuel
    Yang, Guangya
    Weinreich-Jensen, Peter
    JOURNAL OF MODERN POWER SYSTEMS AND CLEAN ENERGY, 2018, 6 (01) : 17 - 26
  • [50] Allocation of synchronous condensers for restoration of system short-circuit power
    Emanuel MARRAZI
    Guangya YANG
    Peter WEINREICH-JENSEN
    Journal of Modern Power Systems and Clean Energy, 2018, 6 (01) : 17 - 26