Optimal Black Start Allocation for Power System Restoration

被引:84
|
作者
Patsakis, Georgios [1 ,2 ]
Rajan, Deepak [3 ]
Aravena, Ignacio [4 ]
Rios, Jennifer [5 ]
Oren, Shmuel [1 ,2 ]
机构
[1] Univ Calif Berkeley, Dept Ind Engn & Operat Res, Berkeley, CA 94720 USA
[2] Univ Calif Berkeley, Tsinghua Berkeley Shenzhen Inst, Berkeley, CA 94720 USA
[3] Lawrence Livermore Natl Lab, Livermore, CA 94551 USA
[4] UC Louvain, Ctr Operat Res & Econometr, B-1348 Louvain La Neuve, Belgium
[5] Pacific Gas & Elect Co PG&E, San Francisco, CA 94110 USA
关键词
Black start allocation; power system restoration; mixed integer programming; NERC compliance; OPTIMIZATION;
D O I
10.1109/TPWRS.2018.2839610
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. We proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.
引用
收藏
页码:6766 / 6776
页数:11
相关论文
共 50 条
  • [31] Black Start Control of a Solid State Transformer for Emergency Power Restoration
    Parks, Nicholas
    Dutta, Sumit
    Ramachandram, Vivek
    Hatua, Kamalesh
    Bhattacharya, Subhashish
    2012 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE), 2012, : 188 - 195
  • [32] Investigation of a Microgrid with Vanadium Redox Flow Battery Storages as a Black Start Source for Power System Restoration
    Dong, D.
    Wang, P.
    Qin, W.
    Han, X.
    PROCEEDINGS OF THE 2014 9TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA), 2014, : 140 - +
  • [33] Optimal load restoration considering dynamic constraints during black-start
    Sichuan University, Chengdu 610065, China
    不详
    Dianli Zidonghua Shebei Electr. Power Autom. Equip., 2009, 10 (88-92):
  • [34] OPTIMAL ISLANDS DETERMINATION IN POWER SYSTEM RESTORATION
    Afrakhte, H.
    Haghifam, M. R.
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY TRANSACTION B-ENGINEERING, 2009, 33 (B6): : 463 - 476
  • [35] Optimal PMU Placement for Power System Restoration
    Golshani, Amir
    Sun, Wei
    Zhou, Qun
    2015 CLEMSON UNIVERSITY POWER SYSTEMS CONFERENCE (PSC), 2015,
  • [36] Study on Key Problems at Power System Black Start
    Guo, Peiying
    Yang, Jianbiao
    Li, Chengzhe
    Yuan, Tian
    ADVANCES IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 614-615 : 1958 - 1961
  • [37] Optimal Mobile Energy Storage Pre-Placement for Black-Start Restoration
    Yip, Joshua
    Santoso, Surya
    Garcia, Manuel
    Pierre, Brian
    Kutanoglu, Erhan
    2022 IEEE ELECTRICAL ENERGY STORAGE APPLICATION AND TECHNOLOGIES CONFERENCE, EESAT, 2022,
  • [38] A Stochastic Program for Black Start Allocation
    Patsakis, Georgios
    Aravena, Ignacio
    Rajan, Deepak
    PROCEEDINGS OF THE 52ND ANNUAL HAWAII INTERNATIONAL CONFERENCE ON SYSTEM SCIENCES, 2019, : 3659 - 3668
  • [39] Optimal power allocation based on power cost in relay system
    Qu, Xi-Qiang
    Xu, Xiao-Dong
    Li, Hong-Jia
    Tao, Xiao-Feng
    Tian, Hui
    Beijing Youdian Daxue Xuebao/Journal of Beijing University of Posts and Telecommunications, 2010, 33 (06): : 21 - 24
  • [40] Use of microturbine generation system for power system black-start
    Liao, Xu-Ming
    Tong, Jia-Peng
    Yu, Tao
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2009, 37 (10): : 83 - 88