Optimal Black Start Allocation for Power System Restoration

被引:84
|
作者
Patsakis, Georgios [1 ,2 ]
Rajan, Deepak [3 ]
Aravena, Ignacio [4 ]
Rios, Jennifer [5 ]
Oren, Shmuel [1 ,2 ]
机构
[1] Univ Calif Berkeley, Dept Ind Engn & Operat Res, Berkeley, CA 94720 USA
[2] Univ Calif Berkeley, Tsinghua Berkeley Shenzhen Inst, Berkeley, CA 94720 USA
[3] Lawrence Livermore Natl Lab, Livermore, CA 94551 USA
[4] UC Louvain, Ctr Operat Res & Econometr, B-1348 Louvain La Neuve, Belgium
[5] Pacific Gas & Elect Co PG&E, San Francisco, CA 94110 USA
关键词
Black start allocation; power system restoration; mixed integer programming; NERC compliance; OPTIMIZATION;
D O I
10.1109/TPWRS.2018.2839610
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. We proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.
引用
收藏
页码:6766 / 6776
页数:11
相关论文
共 50 条
  • [21] An approach for optimal units start-up during bulk power system restoration
    Ketabi, A
    Asmar, H
    Ranjbar, AM
    Feuillet, R
    LESCOPE 01: 2001 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, CONFERENCE PROCEEDINGS, 2001, : 190 - 194
  • [22] Optimal power grid black start using fuzzy logic and expert system
    Ye, Wu
    Xinyan, Fang
    Zheng, Yan
    EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2009, 19 (07): : 969 - 977
  • [23] Optimal Power System Black start using Inverter-Based Generation
    Tbaileh, Ahmad
    Vallem, Mallikarjuna R.
    Quan Nguyen
    Ke, Xinda
    Samaan, Nader A.
    Stefopoulos, Goerge
    Jiang, Xia
    2021 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2021,
  • [24] Optimization of System Partitioning Schemes for Power System Black-Start Restoration Based on Genetic Algorithms
    Liang, Haiping
    Gu, Xueping
    Zhao, Dongwen
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [25] Optimal power allocation strategy for black start in VSC-MTDC systems considering dynamic impacts
    Feng, Wei
    Shi, Qingxin
    Cui, Hantao
    Li, Fangxing
    ELECTRIC POWER SYSTEMS RESEARCH, 2021, 193
  • [26] Investigation on Extended Black-start Schemes of Power System Considering Reasonable Load Restoration
    Gu, Xueping
    Wang, Dajiang
    2014 IEEE PES ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (IEEE PES APPEEC), 2014,
  • [27] Resilient Power System Black-start Restoration Model Considering Uncertain Renewable Energy
    Lin, Yi
    Li, Meng
    Tang, Yuchen
    Lin, Wei
    Chen, Zhiming
    Wang, Zekai
    Ding, Tao
    2022 17TH INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, ROBOTICS AND VISION (ICARCV), 2022, : 540 - 544
  • [28] Decision-making optimization of power system extended black-start coordinating unit restoration with load restoration
    Wang, Dajiang
    Gu, Xueping
    Zhou, Guangqi
    Li, Shaoyan
    Liang, Haiping
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2017, 27 (09):
  • [29] Closure to Discussion on "Optimal Generator Start-Up Strategy for Bulk Power System Restoration"
    Sun, Wei
    Liu, Chen-Ching
    Zhang, Li
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) : 1713 - 1713
  • [30] Development of an alternative black-start plan for system restoration
    Datta, Samrat
    Kolluri, Sharma
    He, Tao
    Khodabakhchian, Bahram
    2006 IEEE/PES POWER SYSTEMS CONFERENCE AND EXPOSITION. VOLS 1-5, 2006, : 1833 - +