Optimal Black Start Allocation for Power System Restoration

被引:84
|
作者
Patsakis, Georgios [1 ,2 ]
Rajan, Deepak [3 ]
Aravena, Ignacio [4 ]
Rios, Jennifer [5 ]
Oren, Shmuel [1 ,2 ]
机构
[1] Univ Calif Berkeley, Dept Ind Engn & Operat Res, Berkeley, CA 94720 USA
[2] Univ Calif Berkeley, Tsinghua Berkeley Shenzhen Inst, Berkeley, CA 94720 USA
[3] Lawrence Livermore Natl Lab, Livermore, CA 94551 USA
[4] UC Louvain, Ctr Operat Res & Econometr, B-1348 Louvain La Neuve, Belgium
[5] Pacific Gas & Elect Co PG&E, San Francisco, CA 94110 USA
关键词
Black start allocation; power system restoration; mixed integer programming; NERC compliance; OPTIMIZATION;
D O I
10.1109/TPWRS.2018.2839610
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Equipment failures, operator errors, natural disasters and cyber-attacks can and have caused extended blackouts of the electric grid. Even though such events are rare, preparedness for them is critical because extended power outages endanger human lives, compromise national security, or result in economic losses of billions of dollars. Since most of the generating units cannot restart without connecting to an energized grid, the system operator relies on a few units with the ability to start autonomously, called Black Start (BS) units, to restore the power system. Allocating and maintaining these units is costly and can severely impact the restoration security and time. We formulate an optimization problem to optimally allocate BS units in the grid, while simultaneously optimizing over the restoration sequence. We extend existing optimal allocation models by including grid considerations such as active power nodal balance, transmission switching, nodal reactive power support and voltage limits. In order to aid the branch and bound tree that solves the resulting large scale mixed integer program, we propose a randomized heuristic that is executed multiple times in parallel on a high-performance computing environment to find feasible solutions. We proceed to solve the IEEE-39, the IEEE-118, and a simplified WECC system with 225 nodes and 136 generators to near optimality.
引用
收藏
页码:6766 / 6776
页数:11
相关论文
共 50 条
  • [1] Integration of wind power for optimal power system black-start restoration
    El-Zonkoly, Amany
    TURKISH JOURNAL OF ELECTRICAL ENGINEERING AND COMPUTER SCIENCES, 2015, 23 (06) : 1853 - 1866
  • [2] Enhanced Power System Restoration Through MILP Black Start Allocation Optimization
    Kabir, Shaharier
    Shufian, Abu
    Islam, Riadul
    Hannan, Nasif
    Zishan, Md Saniat Rahman
    Fattah, Shaikh Anowarul
    2024 IEEE KANSAS POWER AND ENERGY CONFERENCE, KPEC 2024, 2024,
  • [3] Firefly Based Approach for Optimal Power System Black-Start Restoration
    El-Zonkoly, Amany
    Desouki, Hussein
    Farghaly, Ahmed
    PROCCEDINGS OF THE 2014 15TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2014,
  • [4] A framework for black start and power system restoration
    Lindenmeyer, D
    Dommel, HW
    Moshref, A
    Kundur, P
    2000 CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING, CONFERENCE PROCEEDINGS, VOLS 1 AND 2: NAVIGATING TO A NEW ERA, 2000, : 153 - 157
  • [5] Renewable energy sources for complete optimal power system black-start restoration
    El-Zonkoly, Amany Mohamed
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2015, 9 (06) : 531 - 539
  • [6] Black Start Capability Assessment in Power System Restoration
    Sun, Wei
    Liu, Chen-Ching
    Liu, Shanshan
    2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2011,
  • [7] Optimal Black Start Resource Allocation
    Qiu, Feng
    Wang, Jianhui
    Chen, Chen
    Tong, Jianzhong
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (03) : 2493 - 2494
  • [8] Formulations and valid inequalities for optimal black start allocation in power systems
    Patsakis, Georgios
    Aravena, Ignacio
    Rajan, Deepak
    Oren, Shmuel
    ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2023,
  • [9] Research Review of Power System Black-Start Restoration
    Gu X.
    Bai Y.
    Li S.
    Liu Y.
    Diangong Jishu Xuebao/Transactions of China Electrotechnical Society, 2022, 37 (13): : 3183 - 3200
  • [10] Black Start Studies for System Restoration
    Feltes, J. W.
    Grande-Moran, Carlos
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 4895 - 4902