Effect of the start-up length on the biological nutrient removal process

被引:1
|
作者
Fernandez, F. J. [1 ]
Villasenor, J. [1 ]
Rodriguez, L. [2 ]
机构
[1] Univ Castilla La Mancha, ITQUIMA, Dept Chem Engn, E-13071 Ciudad Real, Spain
[2] Alquimia Soluciones Ambientales, Madrid, Spain
来源
WATER POLLUTION IX | 2008年 / 111卷
关键词
activated sludge; biological phosphorus removal; biological nitrogen removal; start-up stage;
D O I
10.2495/WP080511
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
In this work, a study of the start-up stage of a Biological Phosphorus Removal (BPR) process was carried out. To do this, SBR alternating anaerobic and aerobic conditions were used with conventional activated sludge and fed with synthetic influent at the beginning of each cycle. During the length of the cycles (4 h) the most important parameters were determined. The main results obtained were that during the first days of the start-up stage the phosphorus removal percentage increased more quickly that those of the COD and ammonium-nitrogen. However, it was necessary to extend the start-up stage to at least 30 days in order to obtain the maximum phosphorus removal percentages and a stable Phosphorus Accumulating Organisms (PAO) population, whereas the maximum COD and ammonium-nitrogen removal percentages were obtained in about ten days. Once the start-up period had finished the ratio P released to COD stored was determined, obtaining a value of about 0.14, which is significantly lower than the theoretical value (0.55), suggesting the presence of a significant GAO population.
引用
收藏
页码:521 / +
页数:2
相关论文
共 50 条
  • [41] Rapid start-up and nitrogen removal performance of anammox process using activated sludge as an inoculation
    Chen J.
    Zhou X.
    Li X.
    Huagong Jinzhan/Chemical Industry and Engineering Progress, 2022, 41 (07): : 3900 - 3907
  • [42] Anammox-based technologies for nitrogen removal: Advances in process start-up and remaining issues
    Ali, Muhammad
    Okabe, Satoshi
    CHEMOSPHERE, 2015, 141 : 144 - 153
  • [43] Reducing the start-up process duration for semiconductor facilities
    Lin, AYC
    Levy, D
    Garcia, H
    Papushado, E
    1997 IEEE/SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE AND WORKSHOP - ASMC 97 PROCEEDINGS: THEME - THE QUEST FOR SEMICONDUCTOR MANUFACTURING EXCELLENCE: LEADING THE CHARGE INTO THE 21ST CENTURY, 1997, : 202 - 202
  • [44] Diagnostics of the start-up process of an arc hollow cathode
    Belt, David
    Mankowski, John
    IEEE TRANSACTIONS ON PLASMA SCIENCE, 2008, 36 (04) : 1210 - 1211
  • [45] Shell OMEGA process plant start-up successful
    不详
    CHEMISTRY WORLD, 2008, 5 (07): : 15 - 15
  • [46] Fast start-up of anammox process with hydrazine addition
    Miodonski, Stanislaw
    Muszynski-Huhajlo, Mateusz
    Zieba, Bartosz
    Ratkiewicz, Krzysztof
    Kolbuc, Dominika
    Lagocka, Magdalena
    SN APPLIED SCIENCES, 2019, 1 (06):
  • [47] Positive psychological capital and process of business start-up
    Laguna, Mariola
    INTERNATIONAL JOURNAL OF PSYCHOLOGY, 2008, 43 (3-4) : 390 - 391
  • [48] Design and start-up of the bleach filtrate recycle process
    Caron, JR
    Williams, LD
    1996 INTERNATIONAL ENVIRONMENTAL CONFERENCE BOOKS 1 AND 2: PARTNERS IN GLOBAL STEWARDSHIP, 1996, : 669 - 678
  • [49] PROCESS TRAINING SIMULATORS SAVE IN START-UP AND OPERATIONS
    PATHE, DC
    OIL & GAS JOURNAL, 1985, 83 (06) : 74 - &
  • [50] Characterisation of the granulation process during uasb start-up
    Yan, YG
    Tay, JH
    WATER RESEARCH, 1997, 31 (07) : 1573 - 1580