Effect of the start-up length on the biological nutrient removal process

被引:1
|
作者
Fernandez, F. J. [1 ]
Villasenor, J. [1 ]
Rodriguez, L. [2 ]
机构
[1] Univ Castilla La Mancha, ITQUIMA, Dept Chem Engn, E-13071 Ciudad Real, Spain
[2] Alquimia Soluciones Ambientales, Madrid, Spain
来源
WATER POLLUTION IX | 2008年 / 111卷
关键词
activated sludge; biological phosphorus removal; biological nitrogen removal; start-up stage;
D O I
10.2495/WP080511
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
In this work, a study of the start-up stage of a Biological Phosphorus Removal (BPR) process was carried out. To do this, SBR alternating anaerobic and aerobic conditions were used with conventional activated sludge and fed with synthetic influent at the beginning of each cycle. During the length of the cycles (4 h) the most important parameters were determined. The main results obtained were that during the first days of the start-up stage the phosphorus removal percentage increased more quickly that those of the COD and ammonium-nitrogen. However, it was necessary to extend the start-up stage to at least 30 days in order to obtain the maximum phosphorus removal percentages and a stable Phosphorus Accumulating Organisms (PAO) population, whereas the maximum COD and ammonium-nitrogen removal percentages were obtained in about ten days. Once the start-up period had finished the ratio P released to COD stored was determined, obtaining a value of about 0.14, which is significantly lower than the theoretical value (0.55), suggesting the presence of a significant GAO population.
引用
收藏
页码:521 / +
页数:2
相关论文
共 50 条
  • [31] SRAM START-UP USES PROPRIETARY PROCESS
    WILLIAMS, T
    COMPUTER DESIGN, 1989, 28 (02): : 5 - 5
  • [32] How to start up a start-up
    Wyant, James C.
    NATURE PHOTONICS, 2007, 1 (06) : 301 - 302
  • [33] How to start up a start-up
    James C. Wyant
    Nature Photonics, 2007, 1 : 301 - 302
  • [34] START-UP
    BODIN, HAB
    NUCLEAR FUSION, 1974, : 455 - 470
  • [35] START-UP
    RAIKE, W
    BYTE, 1984, 9 (07): : 361 - 362
  • [36] Organic and nutrient removal during start-up period for domestic sewage treatment by an NO mixed carrier system
    Liao, Wei
    Li, Hui-qiang
    Yang, Ping
    2020 11TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND DEVELOPMENT (ICESD 2020), 2020, 167
  • [37] Start-up and performance of a downflow fluidised bed reactor for biological treatment of yellow wastewater and nutrient recovery
    Espinosa-Chavez, Belem
    Ramirez-Vives, Florina
    Zeeman, Grietje
    Monroy-Hermosillo, Oscar
    WATER SCIENCE AND TECHNOLOGY, 2022, 85 (11) : 3208 - 3224
  • [38] Start-Up Demonstration Tests for Products with Start-Up Delay
    Zhao, Xian
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2013, 10 (03): : 329 - 338
  • [39] Influence of start-up modes on the noise characteristics of mixed-flow pump during start-up process
    Zhu, Guojun
    Xuan, Yifan
    Feng, Jianjun
    Tang, Zhenbo
    Li, Yunzhe
    Wang, Like
    MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2024, 214
  • [40] Effect of nitrogen, phosphorus, and sulfur on the start-up of a biological 1,4-dioxane removal process using Pseudonocardia sp. D17
    Isaka, Kazuichi
    Masuda, Takafumi
    Omae, Shuhei
    Mishima, Iori
    Ike, Michihiko
    BIOCHEMICAL ENGINEERING JOURNAL, 2021, 176