Effect of the start-up length on the biological nutrient removal process

被引:1
|
作者
Fernandez, F. J. [1 ]
Villasenor, J. [1 ]
Rodriguez, L. [2 ]
机构
[1] Univ Castilla La Mancha, ITQUIMA, Dept Chem Engn, E-13071 Ciudad Real, Spain
[2] Alquimia Soluciones Ambientales, Madrid, Spain
来源
WATER POLLUTION IX | 2008年 / 111卷
关键词
activated sludge; biological phosphorus removal; biological nitrogen removal; start-up stage;
D O I
10.2495/WP080511
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
In this work, a study of the start-up stage of a Biological Phosphorus Removal (BPR) process was carried out. To do this, SBR alternating anaerobic and aerobic conditions were used with conventional activated sludge and fed with synthetic influent at the beginning of each cycle. During the length of the cycles (4 h) the most important parameters were determined. The main results obtained were that during the first days of the start-up stage the phosphorus removal percentage increased more quickly that those of the COD and ammonium-nitrogen. However, it was necessary to extend the start-up stage to at least 30 days in order to obtain the maximum phosphorus removal percentages and a stable Phosphorus Accumulating Organisms (PAO) population, whereas the maximum COD and ammonium-nitrogen removal percentages were obtained in about ten days. Once the start-up period had finished the ratio P released to COD stored was determined, obtaining a value of about 0.14, which is significantly lower than the theoretical value (0.55), suggesting the presence of a significant GAO population.
引用
收藏
页码:521 / +
页数:2
相关论文
共 50 条
  • [21] Assessment of the positive effect of salinity on the nitrogen removal performance and microbial composition during the start-up of CANON process
    Sitong Liu
    Fenglin Yang
    Zheng Gong
    Zhencheng Su
    Applied Microbiology and Biotechnology, 2008, 80
  • [22] Biological nutrient removal process
    不详
    BIOCYCLE, 1997, 38 (11) : 87 - 87
  • [23] Start-up and Optimization of Denitrifying Phosphorus Removal in ABR-MBR Coupling Process
    Miao X.-N.
    Wang Q.
    Guo K.-C.
    Liu W.-R.
    Shen Y.-L.
    Shen, Yao-Liang (ylshen@mail.usts.edu.cn), 1600, Science Press (41): : 4150 - 4160
  • [24] Improvement of the matrix converter start-up process
    Andreu, Jon
    de Alegria, Inigo
    Kortabarria, Inigo
    Martin, Jose Luis
    Ceballos, Salvador
    IECON 2007: 33RD ANNUAL CONFERENCE OF THE IEEE INDUSTRIAL ELECTRONICS SOCIETY, VOLS 1-3, CONFERENCE PROCEEDINGS, 2007, : 1811 - +
  • [25] Inoculum, start-up and performance of Anammox process
    Tang, Chongjian
    Zheng, Ping
    Chen, Tingting
    Huagong Xuebao/CIESC Journal, 2010, 61 (10): : 2510 - 2516
  • [26] Start-up of the Anammox process in a membrane bioreactor
    Trigo, C.
    Campos, J. L.
    Garrido, J. M.
    Mendez, R.
    JOURNAL OF BIOTECHNOLOGY, 2006, 126 (04) : 475 - 487
  • [27] Analysis of the start-up process for reactive distillation
    Reepmeyer, F
    Repke, JU
    Wozny, G
    CHEMICAL ENGINEERING & TECHNOLOGY, 2003, 26 (01) : 81 - 86
  • [28] Simulation of the start-up process in multicomponent distillation
    Yu, Guocong
    Zhang, Zhibing
    Journal of Chemical Industry and Engineering (China) (English Edition), 1988, 39 (05): : 637 - 642
  • [29] Analysis of the start-up process in reactive rectification
    Reepmeyer, F
    Repke, JU
    Wozny, G
    CHEMIE INGENIEUR TECHNIK, 2002, 74 (09) : 1253 - 1258
  • [30] Start-up and performance of UASB reactors using zeolite for improvement of nitrate removal process
    Montalvo, S.
    Guerrero, L.
    Robles, M.
    Mery, C.
    Huilinir, C.
    Borja, R.
    ECOLOGICAL ENGINEERING, 2014, 70 : 437 - 445