Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)

被引:3
|
作者
Sinaga, R. H. M. [1 ]
Manik, Y. [1 ]
机构
[1] Del Inst Technol, Engn Management Study Program, Laguboti 22381, Toba Samosir, Indonesia
关键词
Geothermal; Sibayak; variable frequency drive; wet bulb;
D O I
10.1088/1755-1315/124/1/012007
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State-owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2x5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15 degrees C to 25 degrees C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15 degrees C to 25 degrees C.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] TECHNOLOGY MANAGING EARTH TEMPERATURE BY GEOTHERMAL POWER PLANT
    Cehlar, Michal
    Pinka, Jan
    Vegsoeova, Ol'ga
    Pinkova, Petra
    [J]. GEOCONFERENCE ON ENERGY AND CLEAN TECHNOLOGIES, VOL 1 (SGEM 2014), 2014, : 497 - 504
  • [42] SCALING AND CORROSION IN AN EXPERIMENTAL GEOTHERMAL POWER-PLANT
    BISHOP, HK
    BRICARELLO, JR
    [J]. JOURNAL OF PETROLEUM TECHNOLOGY, 1978, 30 (SEP): : 1240 - 1242
  • [43] Acid gas removal in geothermal power plant in Iceland
    Berstad, David
    Nord, Lars O.
    [J]. 8TH TRONDHEIM CONFERENCE ON CO2 CAPTURE, TRANSPORT AND STORAGE, 2016, 86 : 32 - 40
  • [44] Thermodynamic performance evaluation of a geothermal ORC power plant
    Altun, A. F.
    Kilic, M.
    [J]. RENEWABLE ENERGY, 2020, 148 : 261 - 274
  • [45] Process control system of the Mutnovskaya geothermal power plant
    Idzon O.M.
    Ivanov V.V.
    Ilyushin V.V.
    Nikol'skii A.I.
    [J]. Power Technology and Engineering, 2004, 38 (1) : 41 - 48
  • [46] ENVIRONMENTAL-IMPACT OF A GEOTHERMAL POWER-PLANT
    AXTMANN, RC
    [J]. SCIENCE, 1975, 187 (4179) : 795 - 803
  • [47] Environmental auditing of the Kamojang geothermal power plant - Indonesia
    Radja, VT
    Sulasdi, D
    [J]. GEOTHERMAL DEVELOPMENT IN THE PACIFIC RIM, 1996, 20 : 483 - 488
  • [48] A BINARY-FLASHING GEOTHERMAL POWER-PLANT
    MICHAELIDES, EE
    SCOTT, GJ
    [J]. ENERGY, 1984, 9 (04) : 323 - 331
  • [49] Energy and Exergy Analysis of Dieng Geothermal Power Plant
    Qurrahman, Alfian Hardi
    Wilopo, Wahyu
    Susanto, Sigit Ponco
    Petrus, Himawan Tri Bayu Murti
    [J]. INTERNATIONAL JOURNAL OF TECHNOLOGY, 2021, 12 (01): : 175 - 185
  • [50] Examination and thermodynamic modelling of a geothermal energy power plant for sustainable development: a case study
    Akbay, Oguzhan
    Yilmaz, Fatih
    [J]. INTERNATIONAL JOURNAL OF EXERGY, 2022, 38 (04) : 398 - 410