Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)

被引:3
|
作者
Sinaga, R. H. M. [1 ]
Manik, Y. [1 ]
机构
[1] Del Inst Technol, Engn Management Study Program, Laguboti 22381, Toba Samosir, Indonesia
关键词
Geothermal; Sibayak; variable frequency drive; wet bulb;
D O I
10.1088/1755-1315/124/1/012007
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State-owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2x5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15 degrees C to 25 degrees C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15 degrees C to 25 degrees C.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] The behavior of silica in geothermal brine from Dieng geothermal power plant, Indonesia
    Pambudi, Nugroho Agung
    Itoi, Ryuichi
    Yamashiro, Rie
    Alam, Boy Yoseph C. S. S. Syah
    Tusara, Loren
    Jalilinasrabady, Saeid
    Khasani, Jaelani
    GEOTHERMICS, 2015, 54 : 109 - 114
  • [42] The integrative use of binary cycle technology to improve thermal efficiency and efficiency in geothermal power plants: A case study of Ulumbu geothermal power plant in Indonesia
    Prasetyo, Bambang Teguh
    Agustina, Lina
    Suyanto, Suyanto
    Guardi, Arli
    Sutriyanto, Himawan
    Pujowidodo, Hariyotejo
    Harmadi, Rudias
    Cahyadi, Cahyadi
    Ifanda, Ifanda
    Anugia, Zakie
    Mustika, Donny
    ENERGY CONVERSION AND MANAGEMENT, 2024, 321
  • [43] Combined cycle power unit with a binary system based on waste geothermal brine at Mutnovsk geothermal power plant
    Tomarov G.V.
    Shipkov A.A.
    Nikol’skii A.I.
    Semenov V.N.
    Thermal Engineering, 2016, 63 (6) : 409 - 413
  • [44] IMPROVING PERFORMANCE AND THERMOECONOMIC OPTIMIZATION OF AN EXISTING BINARY GEOTHERMAL POWER PLANT: A CASE STUDY
    Yilmaz, Ceyhun
    ISI BILIMI VE TEKNIGI DERGISI-JOURNAL OF THERMAL SCIENCE AND TECHNOLOGY, 2020, 40 (01) : 37 - 51
  • [45] ANN Modeling of an ORC-Binary Geothermal Power Plant: Simav Case Study
    Arslan, O.
    Yetik, O.
    ENERGY SOURCES PART A-RECOVERY UTILIZATION AND ENVIRONMENTAL EFFECTS, 2014, 36 (04) : 418 - 428
  • [46] Examination and thermodynamic modelling of a geothermal energy power plant for sustainable development: a case study
    Akbay, Oguzhan
    Yilmaz, Fatih
    INTERNATIONAL JOURNAL OF EXERGY, 2022, 38 (04) : 398 - 410
  • [47] Geothermal power plant in conditions of geological and hydrological characteristics
    Cehlár, Michal
    Jurkasová, Zuzana
    Kudelas, Dušan
    Tutko, Róbert
    Mendel, Ján
    Advanced Materials Research, 2014, 1001 : 63 - 74
  • [48] Geothermal power plant `San Jacinto-Tizate'
    Povarov, Oleg A.
    Tsimmerman, S.D.
    Transactions - Geothermal Resources Council, 1999, 23 : 81 - 87
  • [49] Acid gas removal in geothermal power plant in Iceland
    Berstad, David
    Nord, Lars O.
    8TH TRONDHEIM CONFERENCE ON CO2 CAPTURE, TRANSPORT AND STORAGE, 2016, 86 : 32 - 40
  • [50] SCALING AND CORROSION IN AN EXPERIMENTAL GEOTHERMAL POWER-PLANT
    BISHOP, HK
    BRICARELLO, JR
    JOURNAL OF PETROLEUM TECHNOLOGY, 1978, 30 (SEP): : 1240 - 1242