摘要
Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State-owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2x5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15 degrees C to 25 degrees C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15 degrees C to 25 degrees C.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] A fatal case of hydrogen sulfide poisoning in a geothermal power plant
    Kage, S
    Ito, S
    Kishida, T
    Kudo, K
    Ikeda, N
    [J]. JOURNAL OF FORENSIC SCIENCES, 1998, 43 (04) : 908 - 910
  • [22] First geothermal pilot power plant in Hungary
    Bobok, Elemer
    Toth, Aniko
    [J]. ACTA MONTANISTICA SLOVACA, 2007, 12 : 176 - 180
  • [23] THE BOUILLANTE GEOTHERMAL POWER-PLANT, GUADELOUPE
    JAUD, P
    LAMETHE, D
    [J]. GEOTHERMICS, 1985, 14 (2-3) : 197 - 205
  • [24] Performance analysis of Germencik Geothermal Power Plant
    Unverdi, Murat
    Cerci, Yunus
    [J]. ENERGY, 2013, 52 : 192 - 200
  • [25] Steam power plant associated with geothermal well
    Buchta, Janusz
    [J]. PRZEGLAD ELEKTROTECHNICZNY, 2008, 84 (02): : 68 - 71
  • [26] SPECIFIC OUTPUT POWER OF A DRY GEOTHERMAL PLANT
    WU, C
    [J]. ENERGY, 1991, 16 (04) : 757 - 761
  • [27] The Criteria for Suitable Location of Geothermal Power Plant
    Sowa-Watrak, Anita
    Klosok-Bazan, Iwona
    Gono, Miroslava
    Gono, Radomir
    [J]. PROCEEDINGS OF THE 2017 18TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2017, : 267 - 271
  • [28] Geotherm and geothermal power plant decisions and conditions
    Cehlar, Michal
    Varga, Peter
    Jurkasova, Zuzana
    Paskova, Martina
    [J]. ACTA MONTANISTICA SLOVACA, 2010, 15 : 132 - 138
  • [29] Overview of Kizildere Geothermal Power Plant in Turkey
    Gokcen, G
    Ozturk, HK
    Hepbasli, A
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2004, 45 (01) : 83 - 98
  • [30] Thermodynamic analysis of a binary geothermal power plant
    Ozcan, Zekeriya
    Ekici, Ozgur
    [J]. INTERNATIONAL JOURNAL OF EXERGY, 2021, 36 (01) : 76 - 97