Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)

被引:3
|
作者
Sinaga, R. H. M. [1 ]
Manik, Y. [1 ]
机构
[1] Del Inst Technol, Engn Management Study Program, Laguboti 22381, Toba Samosir, Indonesia
关键词
Geothermal; Sibayak; variable frequency drive; wet bulb;
D O I
10.1088/1755-1315/124/1/012007
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State-owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2x5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15 degrees C to 25 degrees C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15 degrees C to 25 degrees C.
引用
收藏
页数:10
相关论文
共 50 条
  • [21] Geothermal Energy Sources and Geothermal Power Plant Technologies in Turkey
    Haklidir, Fusun Servin Tut
    Energy Systems and Management, 2015, : 115 - 124
  • [22] GEOTHERMAL REINJECTION TECHNOLOGY AND ITS APPLICATION IN GEOTHERMAL POWER PLANT
    Lv, Tai
    Zhu, Qi-chun
    Lu, Hong-bo
    Li, Xue-gang
    ICEET: 2009 INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENT TECHNOLOGY, VOL 1, PROCEEDINGS, 2009, : 683 - 686
  • [23] Energy Optimization Modeling of Geothermal Power Plant ( Case Study: Darajat Geothermal Field Unit III
    Sinaga, R. H. M.
    Darmanto, P. S.
    5th ITB International Geothermal Workshop (IIGW2016), 2016, 42
  • [24] A fatal case of hydrogen sulfide poisoning in a geothermal power plant
    Kage, S
    Ito, S
    Kishida, T
    Kudo, K
    Ikeda, N
    JOURNAL OF FORENSIC SCIENCES, 1998, 43 (04) : 908 - 910
  • [25] First geothermal pilot power plant in Hungary
    Bobok, Elemer
    Toth, Aniko
    ACTA MONTANISTICA SLOVACA, 2007, 12 : 176 - 180
  • [26] THE BOUILLANTE GEOTHERMAL POWER-PLANT, GUADELOUPE
    JAUD, P
    LAMETHE, D
    GEOTHERMICS, 1985, 14 (2-3) : 197 - 205
  • [27] Steam power plant associated with geothermal well
    Buchta, Janusz
    PRZEGLAD ELEKTROTECHNICZNY, 2008, 84 (02): : 68 - 71
  • [28] SPECIFIC OUTPUT POWER OF A DRY GEOTHERMAL PLANT
    WU, C
    ENERGY, 1991, 16 (04) : 757 - 761
  • [29] Performance analysis of Germencik Geothermal Power Plant
    Unverdi, Murat
    Cerci, Yunus
    ENERGY, 2013, 52 : 192 - 200
  • [30] CIVIL ENGINEERING FEATURES OF GEOTHERMAL POWER PLANT
    Peters, Simon
    American Society of Civil Engineers, Journal of the Power Division, 1974, 100 (02): : 157 - 173