Optimizing the Utility Power of a Geothermal Power Plant using Variable Frequency Drive (VFD) (Case Study: Sibayak Geothermal Power Plant)

被引:3
|
作者
Sinaga, R. H. M. [1 ]
Manik, Y. [1 ]
机构
[1] Del Inst Technol, Engn Management Study Program, Laguboti 22381, Toba Samosir, Indonesia
关键词
Geothermal; Sibayak; variable frequency drive; wet bulb;
D O I
10.1088/1755-1315/124/1/012007
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Sibayak Geothermal Power Plant (SGPP) is one of the plants being developed by Pertamina Geothermal Energy (PGE) at the upstream phase. At the downstream phase, State-owned Electricity Company (PLN) through PT. Dizamatra Powerindo is the developer. The gross capacity of the power plant is 13.3 MW, consisting 1 unit of Monoblock (2 MW) developed by PGE and 2 units (2x5.65 MW) operated through Energy Sales Contract by PLN. During the development phase of a geothermal power plant, there is a chance to reduce the utility power in order to increase the overall plant efficiency. Reducing the utility power can be attempted by utilizing the wet bulb temperature fluctuation. In this study, a modeling process is developed by using Engineering Equation Solver (EES) software version 9.430. The possibility of energy saving is indicated by condenser pressure changes as a result of wet bulb temperature fluctuation. The result of this study indicates that the change of condenser pressure is about 50.8% on the constant liquid/gas (L/G) condition of the wet bulb temperature of 15 degrees C to 25 degrees C. Further result indicates that in this power plant, Cooling Tower Fan (CTF) is the facility that has the greatest utility load, followed by Hot Well Pump (HWP). The saving of the greatest utility load is applied trough Variable Frequency Drive (VFD) instrumentation. The result of this modeling has been validated by actual operations data (log sheet). The developed model has also been reviewed trough Specific Steam Consumption (SSC), resulting that constant L/G condition allows the optimum condition on of the wet bulb temperature of 15 degrees C to 25 degrees C.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] The Criteria for Suitable Location of Geothermal Power Plant
    Sowa-Watrak, Anita
    Klosok-Bazan, Iwona
    Gono, Miroslava
    Gono, Radomir
    [J]. PROCEEDINGS OF THE 2017 18TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2017, : 267 - 271
  • [32] Thermodynamic analysis of a binary geothermal power plant
    Ozcan, Zekeriya
    Ekici, Ozgur
    [J]. INTERNATIONAL JOURNAL OF EXERGY, 2021, 36 (01) : 76 - 97
  • [33] Geotherm and geothermal power plant decisions and conditions
    Cehlar, Michal
    Varga, Peter
    Jurkasova, Zuzana
    Paskova, Martina
    [J]. ACTA MONTANISTICA SLOVACA, 2010, 15 : 132 - 138
  • [34] Modeling and optimization of a binary geothermal power plant
    Ghasemi, Hadi
    Paci, Marco
    Tizzanini, Alessio
    Mitsos, Alexander
    [J]. ENERGY, 2013, 50 : 412 - 428
  • [35] Overview of Kizildere Geothermal Power Plant in Turkey
    Gokcen, G
    Ozturk, HK
    Hepbasli, A
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2004, 45 (01) : 83 - 98
  • [36] Zero Emission Geothermal Flash Power Plant
    Bonalumi, Davide
    Bombarda, Paola A.
    Invernizzi, Costante M.
    [J]. ATI 2017 - 72ND CONFERENCE OF THE ITALIAN THERMAL MACHINES ENGINEERING ASSOCIATION, 2017, 126 : 698 - 705
  • [37] DEVELOPMENT OF PLANT PERFORMANCE ANALYSIS SYSTEM FOR GEOTHERMAL POWER PLANT
    Nakao, Yoshinobu
    Takahashi, Toru
    Watanabe, Yutaka
    [J]. PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 2, 2012, : 551 - 555
  • [38] Economic and environmental assessment using emergy of a geothermal power plant
    Jalili, Mohammad
    Chitsaz, Ata
    Hashemian, Mehran
    Rosen, Marc A.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2021, 228
  • [39] Performance and economic analysis of various geothermal power plant systems: Case study for the Chingshui geothermal field in Taiwan
    Chen, Peng-Jen
    Yeh, Tzu-Chuan
    Hsieh, Jui-Ching
    Lee, Bo-Heng
    [J]. Energy Reports, 2024, 12 : 4539 - 4554
  • [40] Hybridization of Concentrated Solar Thermal, Geothermal, and Biomass: Case Study on Kizildere-2 Geothermal Power Plant
    Celebi, Bertug
    Rohani, Shahab
    Derin-Güre, Pınar
    Chandler, Nicholas
    Hazar, Tuğrul
    Halaçoğlu, Ural
    Baker, Derek
    [J]. Energies, 2024, 17 (21)