A two-stage integrating optimization of production scheduling, maintenance and quality

被引:12
|
作者
Zheng, Jiafei [1 ]
Yang, Hongbing [1 ]
Wu, Qingsong [1 ]
Wang, Ziyang [1 ]
机构
[1] Soochow Univ, Sch Mech & Elect Engn, Suzhou 215006, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Production scheduling; preventive maintenance; quality; control chart; genetic algorithm; PREVENTIVE MAINTENANCE; SUBJECT; SYSTEM; POLICY; MODEL;
D O I
10.1177/0954405420921733
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During the process of actual production, production scheduling, preventive maintenance and quality control have a close interaction with each other and thus need to be integrated for improving manufacturing system performance. The aim of this article is to jointly optimize the job sequence, the preventive maintenance locations, the preventive maintenance interval and decision variables of control chart such that the expected cost per unit time and penalty cost due to schedule delay are minimized. A two-stage integrating optimization model of production scheduling, maintenance and quality in a single machine system is developed. A control chart is adopted to monitor the whole process with Taguchi's loss function estimating the quality cost of each condition and perfect preventive maintenance activity is conducted at the end of each interval. A genetic algorithm is designed to solve this model in order to obtain the optimal job sequence and the locations of preventive maintenance. Numerical examples and thorough sensitivity analyses are provided to illustrate the proposed integrated model. Finally, the efficiency of the proposed two-stage integration model is verified by the comparison of the stand-alone model under the same condition. Compared with the stand-alone model, the proposed integrated method can save the cost rate by 12%-42% under five different situations.
引用
收藏
页码:1448 / 1459
页数:12
相关论文
共 50 条
  • [41] On scheduling multiple two-stage flowshops
    Wu, Guangwei
    Chen, Jianer
    Wang, Jianxin
    THEORETICAL COMPUTER SCIENCE, 2020, 818 : 74 - 82
  • [42] Group scheduling in a two-stage flowshop
    Yang, WH
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (12) : 1367 - 1373
  • [43] A two-stage approach for surgery scheduling
    Zhong, Liwei
    Luo, Shoucheng
    Wu, Lidong
    Xu, Lin
    Yang, Jinghui
    Tang, Guochun
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2014, 27 (03) : 545 - 556
  • [44] A two-stage approach for surgery scheduling
    Liwei Zhong
    Shoucheng Luo
    Lidong Wu
    Lin Xu
    Jinghui Yang
    Guochun Tang
    Journal of Combinatorial Optimization, 2014, 27 : 545 - 556
  • [45] Development and optimization of a two-stage gasifier for heat and power production
    Kosov, V. V.
    Zaichenko, V. M.
    XXXI INTERNATIONAL CONFERENCE ON EQUATIONS OF STATE FOR MATTER (ELBRUS 2016), 2016, 774
  • [46] Metamodeling and Optimization of a Blister Copper Two-Stage Production Process
    Jarosz, Piotr
    Kusiak, Jan
    Maecki, Stanisaw
    Morkisz, Pawe
    Oprocha, Piotr
    Pietrucha, Wojciech
    Sztangret, Aukasz
    JOM, 2016, 68 (06) : 1535 - 1540
  • [47] Two-stage fuzzy optimization of an MPMP production planning model
    Yuan, Guo-Qiang
    Liu, Yan-Kui
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 1685 - +
  • [48] Metamodeling and Optimization of a Blister Copper Two-Stage Production Process
    Piotr Jarosz
    Jan Kusiak
    Stanisław Małecki
    Paweł Morkisz
    Piotr Oprocha
    Wojciech Pietrucha
    Łukasz Sztangret
    JOM, 2016, 68 : 1535 - 1540
  • [49] Two-stage fuzzy optimization of a fuzzy production game model
    Sun, Bin
    Liu, Yan-Kui
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 1166 - 1171
  • [50] A methodology for joint optimization for maintenance planning, process quality and production scheduling
    Pandey, Divya
    Kulkarni, Makarand S.
    Vrat, Prem
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 1098 - 1106