A two-stage integrating optimization of production scheduling, maintenance and quality

被引:12
|
作者
Zheng, Jiafei [1 ]
Yang, Hongbing [1 ]
Wu, Qingsong [1 ]
Wang, Ziyang [1 ]
机构
[1] Soochow Univ, Sch Mech & Elect Engn, Suzhou 215006, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Production scheduling; preventive maintenance; quality; control chart; genetic algorithm; PREVENTIVE MAINTENANCE; SUBJECT; SYSTEM; POLICY; MODEL;
D O I
10.1177/0954405420921733
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
During the process of actual production, production scheduling, preventive maintenance and quality control have a close interaction with each other and thus need to be integrated for improving manufacturing system performance. The aim of this article is to jointly optimize the job sequence, the preventive maintenance locations, the preventive maintenance interval and decision variables of control chart such that the expected cost per unit time and penalty cost due to schedule delay are minimized. A two-stage integrating optimization model of production scheduling, maintenance and quality in a single machine system is developed. A control chart is adopted to monitor the whole process with Taguchi's loss function estimating the quality cost of each condition and perfect preventive maintenance activity is conducted at the end of each interval. A genetic algorithm is designed to solve this model in order to obtain the optimal job sequence and the locations of preventive maintenance. Numerical examples and thorough sensitivity analyses are provided to illustrate the proposed integrated model. Finally, the efficiency of the proposed two-stage integration model is verified by the comparison of the stand-alone model under the same condition. Compared with the stand-alone model, the proposed integrated method can save the cost rate by 12%-42% under five different situations.
引用
收藏
页码:1448 / 1459
页数:12
相关论文
共 50 条
  • [21] Coordinated scheduling of production and transportation in a two-stage assembly flowshop
    Wang, K.
    Ma, W. Q.
    Luo, H.
    Qin, H.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (22) : 6891 - 6911
  • [22] Two-stage distributionally robust optimization for joint system design and maintenance scheduling in high-consequence systems
    Zhang, Hanxiao
    Li, Yan-Fu
    Xie, Min
    Zhang, Chen
    IISE TRANSACTIONS, 2024, 56 (08) : 793 - 810
  • [23] Integrated two-stage multi-factory assembly scheduling with maintenance considerations
    Kazemi, Hamed
    Nourelfath, Mustapha
    Fathollahi-Fard, Amir M.
    Gendreau, Michel
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2025, 63 (06) : 2133 - 2149
  • [24] A two-stage robust optimization approach for steelmaking-continuous casting production scheduling under uncertainty
    Jiang S.-L.
    Wen Y.-M.
    Chen L.
    Cao L.-L.
    Peng G.-Z.
    Kongzhi yu Juece/Control and Decision, 2023, 38 (12): : 3516 - 3524
  • [25] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zikai Zhang
    Qiuhua Tang
    Flexible Services and Manufacturing Journal, 2022, 34 : 156 - 203
  • [26] Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics
    Zhang, Zikai
    Tang, Qiuhua
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2022, 34 (01) : 156 - 203
  • [27] Collaborative Optimization for Timetable and Maintenance Window Based on Two-Stage Algorithm
    Xu C.
    Ni S.
    Chen D.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2020, 55 (04): : 882 - 888
  • [28] Efficient shift scheduling in the retail sector through two-stage optimization
    Kabak, Oezguer
    Uelengin, Fuesun
    Aktas, Emel
    Onsel, Sule
    Topcu, Y. Ilker
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 184 (01) : 76 - 90
  • [29] Staffing and scheduling flexible call centers by two-stage robust optimization
    Mattia, Sara
    Rossi, Fabrizio
    Servilio, Mara
    Smriglio, Stefano
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 72 : 25 - 37
  • [30] Two-Stage robust optimization problems with two-stage uncertainty
    Goerigk, Marc
    Lendl, Stefan
    Wulf, Lasse
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (01) : 62 - 78