Two-stage fuzzy optimization of an MPMP production planning model

被引:0
|
作者
Yuan, Guo-Qiang [1 ]
Liu, Yan-Kui [1 ]
机构
[1] Hebei Univ, Coll Math & Comp Sci, Baoding 071002, Hebei, Peoples R China
基金
中国国家自然科学基金;
关键词
production planning; credibility theory; two-stage fuzzy optimization; genetic algorithm;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Based on credibility theory and two-stage fuzzy optimization method, this paper presents a class of multi-product multi-period (MPMP) production planning problem. Some basic properties about the two-stage production-planning model are discussed. In addition, a heuristic algorithm, which combines fuzzy simulations and genetic algorithm (GA), is designed to solve the production planning problem, and a numerical example about the three-product three-period production planning problem is given to show the feasibility of the algorithm.
引用
收藏
页码:1685 / +
页数:3
相关论文
共 50 条
  • [1] Two-stage fuzzy optimization of a fuzzy production game model
    Sun, Bin
    Liu, Yan-Kui
    PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2007, : 1166 - 1171
  • [2] Multiperiod optimization model for oilfield production planning: bicriterion optimization and two-stage stochastic programming model
    Utsav Awasthi
    Remy Marmier
    Ignacio E. Grossmann
    Optimization and Engineering, 2019, 20 : 1227 - 1248
  • [3] Multiperiod optimization model for oilfield production planning: bicriterion optimization and two-stage stochastic programming model
    Awasthi, Utsav
    Marmier, Remy
    Grossmann, Ignacio E.
    OPTIMIZATION AND ENGINEERING, 2019, 20 (04) : 1227 - 1248
  • [4] Two-stage fuzzy production planning expected value model and its approximation method
    Yuan, Guoqiang
    APPLIED MATHEMATICAL MODELLING, 2012, 36 (06) : 2429 - 2445
  • [5] Integrated optimization for production planning and scheduling in a two-stage production system
    An, Yu-Wei
    Yan, Hong-Sen
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (04): : 796 - 806
  • [6] Construction of a two-stage fuzzy management planning model for a computer integrated production management system
    Hsieh, S
    Hsu, S
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2002, 15 (06) : 471 - 483
  • [7] Two-stage optimization model used for community energy planning
    Huang, Zishuo
    Yu, Hang
    Peng, Zhenwei
    Liu, Zhiyuan
    CLEAN, EFFICIENT AND AFFORDABLE ENERGY FOR A SUSTAINABLE FUTURE, 2015, 75 : 2916 - 2921
  • [8] A two-stage stochastic optimization model for port infrastructure planning
    Bhurtyal, Sanjeev
    Hernandez, Sarah
    Eksioglu, Sandra
    Yves, Manzi
    MARITIME ECONOMICS & LOGISTICS, 2024, 26 (02) : 185 - 211
  • [9] A two-stage recourse model for production planning with stochastic demand
    Lai, KK
    Leung, SCH
    Wu, Y
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2005, VOL 4, PROCEEDINGS, 2005, 3483 : 250 - 260
  • [10] Fuzzy MPMP production planning problem with minimum risk criteria
    Yuan Guoqiang
    Liu Yankui
    GLOBALIZATION CHALLENGE AND MANAGEMENT TRANSFORMATION, VOLS I - III, 2007, : 29 - 36