Two-stage fuzzy optimization of an MPMP production planning model

被引:0
|
作者
Yuan, Guo-Qiang [1 ]
Liu, Yan-Kui [1 ]
机构
[1] Hebei Univ, Coll Math & Comp Sci, Baoding 071002, Hebei, Peoples R China
基金
中国国家自然科学基金;
关键词
production planning; credibility theory; two-stage fuzzy optimization; genetic algorithm;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Based on credibility theory and two-stage fuzzy optimization method, this paper presents a class of multi-product multi-period (MPMP) production planning problem. Some basic properties about the two-stage production-planning model are discussed. In addition, a heuristic algorithm, which combines fuzzy simulations and genetic algorithm (GA), is designed to solve the production planning problem, and a numerical example about the three-product three-period production planning problem is given to show the feasibility of the algorithm.
引用
收藏
页码:1685 / +
页数:3
相关论文
共 50 条
  • [21] Design of a two-stage fuzzy classification model
    Li, Tzuu-Hseng S.
    Guo, Nai Ren
    Cheng, Chia Ping
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 35 (03) : 1482 - 1495
  • [22] IFTEM: An interval-fuzzy two-stage stochastic optimization model for regional energy systems planning under uncertainty
    Lin, Q. G.
    Huang, G. H.
    Bass, B.
    Qin, X. S.
    ENERGY POLICY, 2009, 37 (03) : 868 - 878
  • [23] Integrated model for two-stage production planning and its genetic algorithm design
    School of Economics and Management, Beihang University, Beijing 100083, China
    Xitong Fangzhen Xuebao, 2007, 16 (3643-3649):
  • [24] An Integrated Two-Stage Inventory and Workforce Planning Model with Variable Production Rates
    AlDurgam, Mohammad
    Al Hanbali, Ahmad
    Saeed, Talal
    Tuffaha, Firas
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2023, 48 (05) : 7127 - 7144
  • [25] A Two-Stage Fuzzy Chance-Constrained Model for Solid Waste Allocation Planning
    Xu, Y.
    Huang, G. H.
    Cheng, G. H.
    Liu, Y.
    Li, Y. F.
    JOURNAL OF ENVIRONMENTAL INFORMATICS, 2014, 24 (02) : 101 - 110
  • [26] An Integrated Two-Stage Inventory and Workforce Planning Model with Variable Production Rates
    AlDurgam, Mohammad
    Al Hanbali, Ahmad
    Saeed, Talal
    Tuffaha, Firas
    IEEE ACCESS, 2022, 10 : 7127 - 7144
  • [27] An Integrated Two-Stage Inventory and Workforce Planning Model with Variable Production Rates
    Mohammad AlDurgam
    Ahmad Al Hanbali
    Talal Saeed
    Firas Tuffaha
    Arabian Journal for Science and Engineering, 2023, 48 (5) : 7127 - 7144
  • [28] A two-stage simultaneous optimization of NPV and throughput in production planning of open pit mines
    Tabesh, Mohammad
    Afrapoli, Ali Moradi
    Askari-Nasab, Hooman
    RESOURCES POLICY, 2023, 80
  • [29] A Study on Two-Stage Budget Planning by Fuzzy Quantifying Analysis
    Yang, Gino K.
    Chouhuang, Wayne
    COMPUTATIONAL COLLECTIVE INTELLIGENCE: TECHNOLOGIES AND APPLICATIONS, PT I, 2010, 6421 : 230 - 242
  • [30] On the steady state optimization of the biogas production in a two-stage anaerobic digestion model
    Bayen, Terence
    Gajardo, Pedro
    JOURNAL OF MATHEMATICAL BIOLOGY, 2019, 78 (04) : 1067 - 1087