Scheduling Risk Evaluation for the Integrated Design of Blanket System Project for CFETR Based on Fuzzy PRET Method

被引:1
|
作者
Zhang, Ruonan [1 ]
Zhu, Yinfeng [1 ]
Xu, Shuling [2 ]
机构
[1] Anhui Jianzhu Univ, Hefei 230601, Peoples R China
[2] Chinese Acad Sci, Inst Plasma Phys, Hefei 230031, Peoples R China
基金
国家重点研发计划;
关键词
Schedule risk; PRET method; Integrated design; Blanket system; CFETR; Magnetic confinement; LOGIC;
D O I
10.1007/s10894-020-00246-5
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the framework of the conceptual design and engineering design of the Chinese Fusion Engineering Testing Reactor, some preliminary investigation and estimation of the encountered risk factors in the integrated design process of blanket system were carried out. Sub-tasks of the entire project need to be decomposed before performing the integrated design of blanket system in order to perform a risk assessment for each task. To describe the key time of design process and predict the dates of tasks, a fuzzy PERT method is presented. The integrated design of blanket system project is divided into several tasks, which includes the optimistic time, pessimistic time and the most likely time of each task based on the experience of designer and analyst. The earliest start/finish time, latest start/finish time and slack time of each task is calculated by using the fuzzy PERT method. As a result, the critical path is found for scheduling assessment. The completing probability of the project under different requirements during the design period is calculated, which can provide valuable reference for the scheduling assessment of the integrated design of blanket system project.
引用
收藏
页码:156 / 162
页数:7
相关论文
共 50 条
  • [22] Research on the Risk Evaluation of the Medical Care combined PPP Project Based on the Fuzzy Comprehensive Evaluation Method
    Wang, Lifang
    Xiong, Huaping
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1287 - 1293
  • [23] The Application of Fuzzy Synthesis Evaluation Method Based on The Analysis Network Process in Construction Project Risk Evaluation
    Yang Kaiyun
    Nie Qingpeng
    Zhang Ruiling
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 1936 - +
  • [24] Design and Evaluation of a Fuzzy-Based CPU Scheduling Algorithm
    Kadhim, Shatha J.
    Al-Aubidy, Kasim M.
    INFORMATION PROCESSING AND MANAGEMENT, 2010, 70 : 45 - +
  • [25] Application of Fuzzy Comprehensive Evaluation Model Based on Variable Fuzzy Set Method in Construction Enterprises' ERP Project Risk Evaluation
    Wu Yunna
    Huang Zhijun
    2008 INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, ICRMEM 2008, PROCEEDINGS, 2008, : 466 - 471
  • [26] An evaluation method on the integrated safeguards based on fuzzy theory
    Matsuoka, H
    Nishiwaki, Y
    Ryjov, A
    Belenki, A
    INFORMATION SCIENCES, 2002, 142 (1-4) : 131 - 150
  • [27] An evaluation method on the integrated safeguards based on fuzzy theory
    Matsuoka, H
    Nishiwaki, Y
    Ryjov, A
    Belenki, A
    INTELLIGENT TECHNIQUES AND SOFT COMPUTING IN NUCLEAR SCIENCE AND ENGINEERING, 2000, : 377 - 388
  • [28] Research on benefit evaluation method of integrated energy system project based on combination weight
    Li, Changling
    Miao, Xujuan
    Zhang, Chao
    Liu, Jinming
    Cheng, Xiaobin
    THIRD INTERNATIONAL CONFERENCE ON ENERGY ENGINEERING AND ENVIRONMENTAL PROTECTION, 2019, 227
  • [29] Application of Fuzzy Analytic Hierarchy Process Method Based on SWOT Theory in Project Risk Evaluation
    Xu, Wei
    Wang, Guoying
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 3455 - 3458
  • [30] Picture fuzzy normalized projection-based VIKOR method for the risk evaluation of construction project
    Wang, Le
    Zhang, Hong-yu
    Wang, Jian-qiang
    Li, Lin
    APPLIED SOFT COMPUTING, 2018, 64 : 216 - 226