Scheduling Risk Evaluation for the Integrated Design of Blanket System Project for CFETR Based on Fuzzy PRET Method

被引:1
|
作者
Zhang, Ruonan [1 ]
Zhu, Yinfeng [1 ]
Xu, Shuling [2 ]
机构
[1] Anhui Jianzhu Univ, Hefei 230601, Peoples R China
[2] Chinese Acad Sci, Inst Plasma Phys, Hefei 230031, Peoples R China
基金
国家重点研发计划;
关键词
Schedule risk; PRET method; Integrated design; Blanket system; CFETR; Magnetic confinement; LOGIC;
D O I
10.1007/s10894-020-00246-5
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In the framework of the conceptual design and engineering design of the Chinese Fusion Engineering Testing Reactor, some preliminary investigation and estimation of the encountered risk factors in the integrated design process of blanket system were carried out. Sub-tasks of the entire project need to be decomposed before performing the integrated design of blanket system in order to perform a risk assessment for each task. To describe the key time of design process and predict the dates of tasks, a fuzzy PERT method is presented. The integrated design of blanket system project is divided into several tasks, which includes the optimistic time, pessimistic time and the most likely time of each task based on the experience of designer and analyst. The earliest start/finish time, latest start/finish time and slack time of each task is calculated by using the fuzzy PERT method. As a result, the critical path is found for scheduling assessment. The completing probability of the project under different requirements during the design period is calculated, which can provide valuable reference for the scheduling assessment of the integrated design of blanket system project.
引用
收藏
页码:156 / 162
页数:7
相关论文
共 50 条
  • [41] The Application of Fuzzy Comprehensive Evaluation Based on AHP in Risk Evaluation of Engineering Project
    Wang Chengjun
    Zuo Xinhui
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 108 - 112
  • [42] Risk Evaluation of Scientific and Technological Innovation Project Management Based on Fuzzy Evaluation
    Zhang, Xiaoyan
    2011 INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND MANAGEMENT ENGINEERING (ESME 2011), VOLS 1-5, 2011, : 429 - 432
  • [43] Risk Management in Highway Construction Project Based on Integrated Project Management System
    Jing Bingyin
    Jing Chunju
    ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
  • [44] Synthetic evaluation of integrated energy system based on AHP-fuzzy comprehensive assessment method
    Lu, Xiao
    Wu, Jiajia
    Hu, Wei
    Chi, Changyun
    Jiang, Xuedong
    Li, Xiaobo
    2020 INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND BIOENGINEERING (ICEEB 2020), 2020, 185
  • [45] RETRACTED: Analysis and Design of the Project Risk Management System Based on the Fuzzy Clustering Algorithm (Retracted Article)
    Zhong, Ping
    Yin, Hang
    Li, Yuanfu
    JOURNAL OF CONTROL SCIENCE AND ENGINEERING, 2022, 2022
  • [46] Risk assessment based on fuzzy synthetic evaluation method
    Akter, Marin
    Jahan, Momtaz
    Kabir, Rubaiya
    Karim, Dewan Sadia
    Haque, Anisul
    Rahman, Munsur
    Salehin, Mashfiqus
    SCIENCE OF THE TOTAL ENVIRONMENT, 2019, 658 : 818 - 829
  • [47] Risk Assessment of Accounting Information System Based on AHP and Fuzzy Comprehensive Evaluation Method
    Liu Jiawei
    2011 6TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND CONVERGENCE INFORMATION TECHNOLOGY (ICCIT), 2012, : 905 - 908
  • [48] Risk Evaluation of Highway Engineering Project Based on the Fuzzy-AHP
    Yang, Qian
    Wei, Yajun
    INTERNATIONAL CONFERENCE ON GRAPHIC AND IMAGE PROCESSING (ICGIP 2011), 2011, 8285
  • [49] Risk Evaluation on Ship Navigation System Based on Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation Method
    Yan, Mi
    Zhang, Huajun
    Liu, Lishou
    PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 3944 - 3948
  • [50] Fuzzy Comprehensive Evaluation Method for Risk Assessment in EPC International Engineering Project
    Liu, Ruiyu
    Ye, Ziwan
    PROCEEDINGS OF CHINA-CANADA INDUSTRY WORKSHOP ON ENTERPRISE RISK MANAGEMENT 2008, 2008, : 293 - 299