Long Term Evaluation of Advanced PCC System for Coal-fired Power Plant

被引:2
|
作者
Arakawa, Jun [1 ]
Okuno, Shinya [2 ]
Takano, Kenji [1 ]
Yamanaka, Yasuro [1 ]
Matsuyama, Toshiya [1 ]
Feron, Paul [3 ]
Cottrell, Aaron [3 ]
Cousins, Ashleigh [4 ]
Huang, Sanger [4 ]
Davies, Roland [5 ]
Sertori, Paul [5 ]
机构
[1] IHI Corp, Energy & Plant Operat, Koto Ku, 1-1,Toyosu 3 Chome, Tokyo 1358710, Japan
[2] IHI Corp, Corp Res & Dev, Isogo Ku, 1,Shin Nakahara Cho, Yokohama, Kanagawa 2358501, Japan
[3] CSIRO Energy, POB 330, Newcastle, NSW 2300, Australia
[4] CSIRO Energy, POB 883, Kenmore, Qld 4069, Australia
[5] AGL Loy Yang, Bartons Lane, Traralgon, Vic 3844, Australia
关键词
Post combustion; CO2; capture; amine solvent; coal fired power plant; Demonstration;
D O I
10.1016/j.egypro.2017.03.1253
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
IHI, with technical support from CSIRO, designed and constructed the "PICA pilot plant", for the continued development of an advanced PCC process, which will enable a reduction in the CO2 capture absorbent regeneration energy by 40% compared to the conventional MEA based process. The project team installed the pilot plant at the AGL Loy Yang power plant in Australia. The pilot plant has been commissioned and tested in a conventional MEA based process configuration and has commenced a 5,000 hour operating campaign using the IHI absorbent and the IHI optimized process configuration, and had achieved 1,800 hours of operationby mid September, 2016. The designed CO2 capture ratio of 90% has been achieved and stable plant operation has been confirmed. Continuous analysis will be kept for confirming the performance and robustness of the system. (C) 2017 Published by Elsevier Ltd.
引用
收藏
页码:1061 / 1068
页数:8
相关论文
共 50 条
  • [21] Models for Coal Blending with Inventory in Coal-Fired Power Plant
    Zhao Jian
    Liu Shi-xin
    2013 25TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2013, : 1790 - 1793
  • [22] Present status of advanced coal-fired power plants
    vanLiere, J
    MATERIALS AT HIGH TEMPERATURES, 1997, 14 (02) : 73 - 78
  • [23] CONVENTIONAL AND ADVANCED COAL-FIRED POWER-STATIONS
    POHL, JH
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1979, 33 (NOV): : 12 - 14
  • [24] EVALUATION OF COAL-FIRED, FLUID BED COMBINED CYCLE POWER-PLANT
    GIRAMONTI, AJ
    HORGAN, JJ
    SMITH, JW
    HUBER, DA
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 1978, 175 (MAR): : 21 - 21
  • [25] Coal-fired power plant pollution in South Africa
    Makoni, Munyaradzi
    LANCET RESPIRATORY MEDICINE, 2023, 11 (10): : 866 - 866
  • [26] Thermoeconomic operation optimization of a coal-fired power plant
    Xiong, Jie
    Zhao, Haibo
    Zhang, Chao
    Zheng, Chuguang
    Luh, Peter B.
    ENERGY, 2012, 42 (01) : 486 - 496
  • [27] Desulfurization of Coal-fired Power Plant Emissions.
    Beier, Ernst
    Glueckauf-Forschungshefte, 1981, 42 (06): : 275 - 280
  • [28] North Dakota coal-fired power plant planned
    不详
    MINING ENGINEERING, 2001, 53 (09) : 13 - 13
  • [29] Coal-fired power plant to bury issue of emissions
    Hannah Hoag
    Nature, 2003, 422 : 7 - 7
  • [30] Simulation of Emission from Coal-Fired Power Plant
    Nemalipuri, Pruthiviraj
    Das, Harish Chandra
    Pradhan, Malay Kumar
    ADVANCES IN MECHANICAL ENGINEERING, ICRIDME 2018, 2020, : 975 - 986