Models for Coal Blending with Inventory in Coal-Fired Power Plant

被引:0
|
作者
Zhao Jian [1 ]
Liu Shi-xin [1 ]
机构
[1] Northeastern Univ, Coll Informat Sci & Engn, Shenyang 110819, Peoples R China
关键词
coal blending; inventory; mixed integer programming; coal quality parameters; COMBUSTION;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Coal blending technology has attracted much attention in coal-fired power plant of China, especially used to solve the conflict of actual supplied coal and designed coal in the boiler. According to blending schemes and relations between single coal and blending coal used in the factory, this paper formulates a resource-constrained 0-1 mixed integer programming model considering inventory by using the minimum coal blend costs as the objective function. This model determines the proportion of each component coal that is in a ton of the optimum coal blend. In addition, all coal quality parameters calculated by linear constraints in the coal blend should be within the range of given border. Finally, we get the optimum solutions of the model by setting different inventory problems and prices of each single coal in the CPLEX software. The results provide a good reference for coal blending.
引用
收藏
页码:1790 / 1793
页数:4
相关论文
共 50 条
  • [1] Optimization model of steam coal blending in coal-fired power plant
    Zhao, Jian
    Liu, Shi-Xin
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2015, 36 (10): : 1388 - 1392
  • [2] A Coal Blending Optimization Model for Minimizing the Cost of Coal-Fired Power Enterprises
    Yao, Li
    Zhang, Zhi
    Guan, Li
    Fang, Le
    [J]. 2023 5TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES, 2023, : 1412 - 1417
  • [3] Coal Fired Power Plant: A Review on Coal Blending and Emission Issues
    Zaid, Mohammad Zahari Sukimi Mat
    Wahid, Mazlan Abdul
    Mailah, Musa
    Mazlan, Mohammad Amri
    Saat, Aminuddin
    [J]. 10TH INTERNATIONAL MEETING OF ADVANCES IN THERMOFLUIDS (IMAT 2018): SMART CITY: ADVANCES IN THERMOFLUID TECHNOLOGY IN TROPICAL URBAN DEVELOPMENT, 2019, 2062
  • [4] Repowering a small coal-fired power plant
    Miell, Rick
    [J]. POWER ENGINEERING, 2007, 111 (11) : 24 - 24
  • [5] Court blocks coal-fired power plant
    不详
    [J]. CHEMICAL & ENGINEERING NEWS, 2008, 86 (27) : 19 - 19
  • [6] 1600 megawatt coal-fired power plant
    不详
    [J]. BAUINGENIEUR, 2009, 84 : A14 - A14
  • [7] Coal-fired power plant tour notes
    Yoshida, Yoshiaki
    [J]. Journal of the Institute of Electrical Engineers of Japan, 2023, 143 (01):
  • [8] Performance evaluation of a coal-fired power plant
    [J]. Sharma, A.Kr. (avdhesh_sharma35@yahoo.co.in), 1600, RAMS Consultants (09):
  • [9] THE APPLICATION OF LINEAR GOAL PROGRAMMING TO COAL-FIRED POWER-PLANT BLENDING PROBLEMS
    LONERGAN, JE
    [J]. MINING ENGINEERING, 1984, 36 (01) : 23 - 23
  • [10] Modeling and Application of Coal Pulverizing System for Coal-fired Power Plant
    Yu, Tong
    Yuan, Jingqi
    [J]. RESOURCES AND SUSTAINABLE DEVELOPMENT, PTS 1-4, 2013, 734-737 : 2587 - 2591