Success model of project management information system in construction

被引:74
|
作者
Lee, Seul-Ki [1 ]
Yu, Jung-Ho [1 ]
机构
[1] Kwangwoon Univ, Dept Construct & Engn, Seoul, South Korea
基金
新加坡国家研究基金会;
关键词
Project Management Information System (PMIS); IS success model; Construction; Structural equation model; MCLEAN MODEL; SERVICE QUALITY; MIS SUCCESS; PERFORMANCE; CONTEXT; DELONE;
D O I
10.1016/j.autcon.2012.04.015
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Among various IT solutions, the internet-based (or web-based) PMIS has been highlighted because of its strong advantages. While not sufficient to insure project success, using PMIS to manage projects has thus become a necessity. Establishing a success model of a specific information system is critical to understand the mechanism of IS success, the various dimensions of IS performance, and the factors and their causal relations in IS success. As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. While not sufficient to insure project success, using PMIS to manage projects has thus become a necessity. However, research that attempts to establish or apply an IS success model have relatively recently begun to emerge and not many have been carried out as yet. Therefore, the main propose of this study is to develop and validate the ASP-PMIS success model based on the DeLone and McLean (2003) IS success model. A questionnaire instrument was remitted to experienced users (CMs and constructors), and 253 completed questionnaires were retrieved. Using AMOS 18.0, we used Structural Equation Modeling for hypothesis testing. The validated ASP-based PMIS success model can serve as a foundation for positioning and comparing PMIS success research, and can provide users with a useful framework for evaluating PMIS success. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:82 / 93
页数:12
相关论文
共 50 条
  • [31] Design and Implementation of Network Information System for Large Project Construction Management
    Guan Jiaqing
    Tang Jingying
    [J]. 2010 INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATION AND 2010 ASIA-PACIFIC CONFERENCE ON INFORMATION TECHNOLOGY AND OCEAN ENGINEERING: CICC-ITOE 2010, PROCEEDINGS, 2010, : 20 - 23
  • [32] A Plan for Constructing an Information Service System for Construction Project Management using GIS Information
    Kim, SeongJin
    Ok, Hyun
    [J]. PROCEEDINGS OF THE 8TH INTERNATIONAL JOINT CONFERENCE ON KNOWLEDGE DISCOVERY, KNOWLEDGE ENGINEERING AND KNOWLEDGE MANAGEMENT, VOL 3 (KMIS), 2016, : 241 - 247
  • [33] Developing a Diamond Framework Model Based on "Integration" of Project Success Measures for Construction Project Management in Yemen
    Al-Kuhail, Muaadh Yahya
    Al-Dafiry, Hamoud Ahmed
    Barakat, Tarek Abdullah
    Al-Ansi, Abdulwahad
    [J]. PERTANIKA JOURNAL OF SCIENCE AND TECHNOLOGY, 2021, 29 (03): : 1787 - 1810
  • [34] SUCCESS EVALUATION MODEL FOR PROJECT MANAGEMENT
    Doskocil, Radek
    Skapa, Stanislav
    Olsova, Petra
    [J]. E & M EKONOMIE A MANAGEMENT, 2016, 19 (04): : 167 - 185
  • [35] Study on system and structure for construction project management mutually model
    Dan, Wang
    Ying, Sun
    Zhongfu, Li
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 334 - 336
  • [36] Ranking the Project Management Success Factors for Construction Project in South India
    Aneesha, K.
    Haridharan, M. K.
    [J]. INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND INFRASTRUCTURAL ISSUES IN EMERGING ECONOMIES (ICCIEE 2017), 2017, 80
  • [37] EFFECT OF RELATIONSHIP MANAGEMENT ON CONSTRUCTION PROJECT SUCCESS DELIVERY
    Daboun, Omar
    Abidin, Nur IzieAdiana
    Khoso, Ali Raza
    Chen, Zhen-Song
    Yusof, Aminah Md
    Skibniewski, Miroslaw J.
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2023, 29 (05) : 372 - 397
  • [38] Critical Success Factors for Sustainable Construction Project Management
    Gunduz, Murat
    Almuajebh, Mohammed
    [J]. SUSTAINABILITY, 2020, 12 (05)
  • [39] Critical Success Factors for Construction Project Management in Nigeria
    Musa, Mohammed Mukhtar
    Bin Amirudin, Roslan
    Dalhatu, Abdussalam
    Musa, Mohammed Aminu
    [J]. ADVANCED SCIENCE LETTERS, 2018, 24 (05) : 3809 - 3813
  • [40] Construction of information system of a project institute
    Paljanov, PA
    [J]. NEFTYANOE KHOZYAISTVO, 2004, (03): : 48 - 50