Key Last Planner System Metrics to Assess Project Performance in High-Rise Building and Industrial Construction Projects

被引:9
|
作者
Perez, Daniel [1 ]
Lagos, Camilo [1 ]
Alarcon, Luis Fernando [1 ]
机构
[1] Pontificia Univ Catolica Chile, Dept Construct Engn & Management, Vicuna Mackenna 4860, Santiago 7820436, Chile
关键词
IMPLEMENTATION; BENEFITS; THINKING;
D O I
10.1061/(ASCE)CO.1943-7862.0002209
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Last Planner System (LPS) establishes short cycles of planning and control, comprising LP, the make-ready process, short-term planning commitments, identifying reasons for noncompletion, and implementing corrective actions. Most LPS research has covered longitudinal case studies, but quantitative transversal research is needed to determine the impact of key LPS processes in performance. The researchers aimed to determine the relationships between LPS components and project performance. Twenty three metrics were established to evaluate six components and 253 possible correlations between them. The authors assessed information from 255 projects and found 131 projects, in five categories, with sufficient information to construct the metrics. Two categories had sufficient sample sizes, which produced a sample of 71 high-rise building (HR) and 28 industrial construction (IC) projects. Each sample was assessed separately to test the correlations, and the project categories were compared to determine statistically significant differences. Then, the projects were classified according to their schedule performance outcome, using a clustering algorithm to find differences between high- and low-performance projects. Statistically significant correlations between the six components were found in both samples, six metrics presented statistically significant differences between high and low performance in HR projects and one in IC projects. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] Performance of hybrid mass damper system applied to a 36-storey high-rise building
    Nagashima, Ichiro
    Maseki, Ryota
    Asami, Yutaka
    Hirai, Jun
    Abiru, Hisanori
    Earthquake Engineering and Structural Dynamics, 2001, 30 (11) : 1615 - 1637
  • [42] Performance of hybrid mass damper system applied to a 36-storey high-rise building
    Nagashima, I
    Maseki, R
    Asami, Y
    Hirai, J
    Abiru, H
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2001, 30 (11): : 1615 - 1637
  • [43] The effect of damper leakage and fire size on the performance of smoke control system in high-rise building
    Kun Hyuk Sung
    Hyun Ju Shin
    Dabin Baek
    Hong Sun Ryou
    Journal of Mechanical Science and Technology, 2017, 31 : 4029 - 4034
  • [44] Study on Evaluation Method of High-rise Building Performance by Equivalent Single Degree of Freedom System
    Liang, Xingwen
    Xin, Li
    Tong, Yuesheng
    ADVANCES IN CONCRETE AND STRUCTURES, 2009, 400-402 : 599 - 605
  • [45] The effect of damper leakage and fire size on the performance of smoke control system in high-rise building
    Sung, Kun Hyuk
    Shin, Hyun Ju
    Baek, Dabin
    Ryou, Hong Sun
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2017, 31 (08) : 4029 - 4034
  • [46] Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project
    Ham, Namhyuk
    Moon, Sungkon
    Kim, Ju-Hyung
    Kim, Jae-Jun
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (06)
  • [47] Effective control measures to minimize cost overrun during construction phase of high-rise residential building projects in Chongqing, China
    Wang, Yue
    Ghazali, Farid Ezanee Mohamed
    ARCHIVES OF CIVIL ENGINEERING, 2023, 69 (03) : 79 - 94
  • [48] Analysis of the Implemented Project for the Construction of a High-Rise Building Between Two Low-Rise Buildings in the Zone of Maximum Mutual Influence of Their Foundations
    Al−Bukhaiti, Ali
    Ledenev, Vektor
    Savinov, Yaroslav
    Umnova, Olga
    Lecture Notes in Civil Engineering, 2023, 287 : 67 - 77
  • [49] Mechanical Performance and Failure Mode Research on the Braced Frame Joint of Tower Cranes in High-Rise Building Construction
    Yang, Yang
    Zhang, Zhen
    Xu, Liangjin
    Yao, Gang
    FRONTIERS IN MATERIALS, 2022, 9
  • [50] Automatic tower crane layout planning system for high-rise building construction using generative adversarial network
    Li, Rongyan
    Chi, Hung-Lin
    Peng, Zhenyu
    Li, Xiao
    Chan, Albert P. C.
    ADVANCED ENGINEERING INFORMATICS, 2023, 58