Key Last Planner System Metrics to Assess Project Performance in High-Rise Building and Industrial Construction Projects

被引:9
|
作者
Perez, Daniel [1 ]
Lagos, Camilo [1 ]
Alarcon, Luis Fernando [1 ]
机构
[1] Pontificia Univ Catolica Chile, Dept Construct Engn & Management, Vicuna Mackenna 4860, Santiago 7820436, Chile
关键词
IMPLEMENTATION; BENEFITS; THINKING;
D O I
10.1061/(ASCE)CO.1943-7862.0002209
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Last Planner System (LPS) establishes short cycles of planning and control, comprising LP, the make-ready process, short-term planning commitments, identifying reasons for noncompletion, and implementing corrective actions. Most LPS research has covered longitudinal case studies, but quantitative transversal research is needed to determine the impact of key LPS processes in performance. The researchers aimed to determine the relationships between LPS components and project performance. Twenty three metrics were established to evaluate six components and 253 possible correlations between them. The authors assessed information from 255 projects and found 131 projects, in five categories, with sufficient information to construct the metrics. Two categories had sufficient sample sizes, which produced a sample of 71 high-rise building (HR) and 28 industrial construction (IC) projects. Each sample was assessed separately to test the correlations, and the project categories were compared to determine statistically significant differences. Then, the projects were classified according to their schedule performance outcome, using a clustering algorithm to find differences between high- and low-performance projects. Statistically significant correlations between the six components were found in both samples, six metrics presented statistically significant differences between high and low performance in HR projects and one in IC projects. (C) 2021 American Society of Civil Engineers.
引用
收藏
页数:14
相关论文
共 50 条
  • [31] Thermal performance of double brick wall construction on the building envelope of high-rise hotel in Malaysia
    Nasir, Muhammad Hafeez Abdul
    Hassan, Ahmad Sanusi
    JOURNAL OF BUILDING ENGINEERING, 2020, 31
  • [32] Study on Fire-rescue Command System and Key Technology of Ultra High-rise Building
    Chen, Jianguo
    Zhang, Xiaole
    Su, Guofeng
    Chen, Tao
    2012 5TH INTERNATIONAL CONGRESS ON IMAGE AND SIGNAL PROCESSING (CISP), 2012, : 1906 - 1910
  • [33] UAV Integration in Current Construction Safety Planning and Monitoring Processes: Case Study of a High-Rise Building Construction Project in Chile
    Martinez, Jhonattan G.
    Gheisari, Masoud
    Alarcon, Luis F.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (03)
  • [34] Seismic performance of high-rise building with a rock-slip isolation system with cables
    Zhang, Wenxue
    Yin, Xiaoxi
    Chen, Ying
    Fei, Kai
    STRUCTURAL DESIGN OF TALL AND SPECIAL BUILDINGS, 2020, 29 (04):
  • [35] ENHANCING THE OPERATIONAL PERFORMANCE OF THE CENTRAL CHILLED WATER SYSTEM IN A SUPER HIGH-RISE BUILDING
    Wang, S. W.
    Ma, Z. J.
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 1857 - 1866
  • [36] A Research Framework of Mitigating Construction Accidents in High-Rise Building Projects via Integrating Building Information Modeling with Emerging Digital Technologies
    Manzoor, Bilal
    Othman, Idris
    Pomares, Juan Carlos
    Chong, Heap-Yih
    APPLIED SCIENCES-BASEL, 2021, 11 (18):
  • [37] Green Building Performance Analysis of High-rise Residence in Steel Structure Residence System
    Gong, Min
    Zhu, Wei
    ADVANCED BUILDING MATERIALS AND STRUCTURAL ENGINEERING, 2012, 461 : 83 - 87
  • [38] Integrating Key Elements for Smooth Project Execution: Unveiling the Interplay of Critical Success Factors in High-Rise Construction
    Aragaw, Bisrat Teshome
    Cherkos, Fikreyesus Demeke
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2025, 17 (02)
  • [39] Calculation & Analysis on Integral Mound-lifting System of Shear Wall Construction in High-rise Building
    Wang, Fan
    Zeng, Yunsheng
    PROGRESS IN STRUCTURE, PTS 1-4, 2012, 166-169 : 770 - 775
  • [40] Study on the post-processing system of groundwater produced by high-rise building foundation pit construction
    Zhang, Cheng-Xing
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON MECHANICS AND MECHATRONICS (ICMM 2015), 2016, : 1193 - 1198