Mechanical Analysis of Prestressed Concrete Partially Cable-Stayed Bridge with Corrugated Steel Webs

被引:0
|
作者
Liu, Wenjuan [1 ]
Zhang, Fengping [1 ]
Li, Peifeng [2 ]
Zhang, Rui [1 ]
Wan, Shui [2 ]
机构
[1] Highway Adm, HangHaiXiLu 26, Zhengzhou, Henan, Peoples R China
[2] Southeast Univ, Sch Transportat, SiPaiLou 2, Nanjing, Jiangsu, Peoples R China
关键词
Corrugated Steel Web; Partially Cable-Stayed Bridge; Finite Element; Structural Analysis;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The structure of C-bridge is prestressed concrete partially cable-stayed bridge with corrugated steel webs with a main span of 188m, and the span arrangement is 58m+118m+188m+108m, and the form of box-girder section is one-box four-rooms with inclined webs. In this paper, the finite element method is used to model C-bridge's structure and do analysis of construction stage and completed bridge stage, and the analysis is checked with the current corresponding regulatory of bridge design and construction. Checking results show that under the existing highway-I level loads, the main beam's carrying capacity, stress and crack resistance meet the regulatory requirements. Meanwhile, the adjustment process of cables for the partially cable-stayed bridge is narrated. The checking process also reflects the mechanical properties of corrugated steel webs.
引用
收藏
页码:166 / 170
页数:5
相关论文
共 50 条
  • [1] Analysis on dynamic characteristics of partially cable-stayed prestressed concrete bridge
    Shangguan, Ping
    Fang, Zhen-Zheng
    Zhuo, Wei-Dong
    [J]. ADVANCES IN STRUCTURAL ENGINEERING:THEORY AND APPLICATIONS VOLS 1 AND 2, 2006, : 1336 - 1341
  • [2] Chaoyang Bridge, China: a double-deck cable-stayed bridge with corrugated steel webs
    Deng, Wenqin
    Zhang, Jiandong
    Liu, Duo
    Hu, Jun
    Hu, Fangjian
    Zhong, Zhibing
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 2019, 172 (01) : 45 - 48
  • [3] A study on a hybrid system of cable-stayed prestressed concrete bridge and steel suspension bridge
    Takemura, H
    Ohura, T
    Onushi, M
    Tanabe, T
    [J]. STRAIT CROSSINGS 2001, 2001, : 61 - 66
  • [4] Space grid analysis method in modelling shear lag of cable-stayed bridge with corrugated steel webs
    Ma, Ye
    Ni, Ying-Sheng
    Xu, Dong
    Li, Jin-Kai
    [J]. STEEL AND COMPOSITE STRUCTURES, 2017, 24 (05): : 549 - 559
  • [5] Study of Eccentric Load Coefficient of Pre-stressed Concrete Partial Cable-Stayed Bridge with Corrugated Steel Webs
    Nian, Yuze
    Tian, Junliang
    Li, Suisheng
    Liu, Wenjuan
    Hu, Tao
    Chang, Canhua
    [J]. PROCEEDINGS OF THE 2017 GLOBAL CONFERENCE ON MECHANICS AND CIVIL ENGINEERING (GCMCE 2017), 2017, 132 : 224 - 230
  • [6] Research on Mechanical Behavior of Box Girder with Corrugated Steel Webs of Cable Stayed Bridge
    Lv, Liang
    Liang, Bin
    [J]. ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 583 - 586
  • [7] Analysis on Safety of Removing the Closure Segment in a Prestressed Concrete Cable-stayed Bridge
    Li, Hong-jiang
    Li, Wan-heng
    Zhang, Jin-quan
    [J]. INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 464 - 473
  • [8] Structural behavior of cable anchorage zones in prestressed concrete cable-stayed bridge
    Jo, BW
    Byun, YJ
    Tae, GH
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2002, 29 (01) : 171 - 180
  • [9] The effect of cable loosening on seismic response of a prestressed concrete cable-stayed bridge
    Wu, Q
    Takahashi, K
    Nakamura, S
    [J]. JOURNAL OF SOUND AND VIBRATION, 2003, 268 (01) : 71 - 84
  • [10] CABLE-STAYED BRIDGES OF PRESTRESSED CONCRETE
    PODOLNY, W
    [J]. JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1973, 18 (01): : 68 - 79