共 50 条
- [41] Stay Cable Tubes Positioning Control of Prestressed Concrete Low-pylon Cable-stayed Bridge [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1971 - 1975
- [42] Buckling analysis of a long span steel cable-stayed bridge [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 1387 - 1391
- [43] Optimization of initial cable forces in prestressed concrete cable-stayed bridges [J]. Tongji Daxue Xuebao, 2 (120-124):
- [44] Dynamic analysis of a cable-stayed deck steel arch bridge [J]. J. Constr. Steel Res., 8 (1024-1035):
- [45] DESIGN OF A CABLE-STAYED STEEL COMPOSITE BRIDGE [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1986, 112 (03): : 489 - 504
- [47] Modal Analysis of a Cable-stayed Bridge [J]. INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
- [49] Optimum design of concrete cable-stayed bridges with prestressed decks [J]. INTERNATIONAL JOURNAL FOR COMPUTATIONAL METHODS IN ENGINEERING SCIENCE & MECHANICS, 2016, 17 (5-6): : 339 - 349
- [50] Stochastic Analysis of Prestressed Concrete Cable-stayed Bridges considering Construction Errors [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1023 - 1028