Mechanical Analysis of Prestressed Concrete Partially Cable-Stayed Bridge with Corrugated Steel Webs

被引:0
|
作者
Liu, Wenjuan [1 ]
Zhang, Fengping [1 ]
Li, Peifeng [2 ]
Zhang, Rui [1 ]
Wan, Shui [2 ]
机构
[1] Highway Adm, HangHaiXiLu 26, Zhengzhou, Henan, Peoples R China
[2] Southeast Univ, Sch Transportat, SiPaiLou 2, Nanjing, Jiangsu, Peoples R China
关键词
Corrugated Steel Web; Partially Cable-Stayed Bridge; Finite Element; Structural Analysis;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The structure of C-bridge is prestressed concrete partially cable-stayed bridge with corrugated steel webs with a main span of 188m, and the span arrangement is 58m+118m+188m+108m, and the form of box-girder section is one-box four-rooms with inclined webs. In this paper, the finite element method is used to model C-bridge's structure and do analysis of construction stage and completed bridge stage, and the analysis is checked with the current corresponding regulatory of bridge design and construction. Checking results show that under the existing highway-I level loads, the main beam's carrying capacity, stress and crack resistance meet the regulatory requirements. Meanwhile, the adjustment process of cables for the partially cable-stayed bridge is narrated. The checking process also reflects the mechanical properties of corrugated steel webs.
引用
收藏
页码:166 / 170
页数:5
相关论文
共 50 条
  • [31] The concrete cable-stayed Helgeland bridge in Norway
    Svensson, HS
    Jordet, E
    [J]. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1996, 114 (02) : 54 - 63
  • [32] Evaluation of Thermal Effects on Cable Forces of a Long-Span Prestressed Concrete Cable-Stayed Bridge
    Wang, J. F.
    Zhang, J. T.
    Xu, R. Q.
    Yang, Z. X.
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2019, 33 (06)
  • [33] Stay Cable Tubes Positioning Control of Prestressed Concrete Low-pylon Cable-stayed Bridge
    Wang, Hao
    Chi, Yanbin
    Li, Yalin
    [J]. PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1971 - 1975
  • [34] DESIGN OF A CABLE-STAYED STEEL COMPOSITE BRIDGE
    SVENSSON, HS
    CHRISTOPHER, BG
    SAUL, R
    [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1986, 112 (03): : 489 - 504
  • [35] Buckling analysis of a long span steel cable-stayed bridge
    Wei, Y.
    He, Y. T.
    Ruan, X.
    Ding, L.
    [J]. LIFE-CYCLE ANALYSIS AND ASSESSMENT IN CIVIL ENGINEERING: TOWARDS AN INTEGRATED VISION, 2019, : 1387 - 1391
  • [36] Dynamic analysis of a cable-stayed deck steel arch bridge
    Galvin, P.
    Dominguez, J.
    [J]. JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2007, 63 (08) : 1024 - 1035
  • [37] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    [J]. INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [38] Optimum design of concrete cable-stayed bridges with prestressed decks
    Martins, Alberto M. B.
    Simoes, Luis M. C.
    Negrao, Joao H. J. O.
    [J]. INTERNATIONAL JOURNAL FOR COMPUTATIONAL METHODS IN ENGINEERING SCIENCE & MECHANICS, 2016, 17 (5-6): : 339 - 349
  • [39] Stochastic Analysis of Prestressed Concrete Cable-stayed Bridges considering Construction Errors
    Guan, Hua
    Chen, Dewei
    [J]. ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1023 - 1028
  • [40] Shear performance of tapered box girders with corrugated steel webs in extradosed cable-stayed bridges under cable forces
    Cheng, Yikai
    Su, Xiaolong
    Zhou, Man
    Zhang, Jiandong
    [J]. ENGINEERING STRUCTURES, 2024, 310