Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems

被引:38
|
作者
Ballestin, Francisco [1 ]
Blanco, Rosa [1 ]
机构
[1] Univ Publ Navarra, Dpto Estadist & Invest Operat, Fac Econ & Empresariales, Pamplona, Spain
关键词
Resource-constrained project scheduling; Multi-objective; Heuristic algorithms; GENETIC ALGORITHM; HEURISTICS;
D O I
10.1016/j.cor.2010.02.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Project scheduling is an inherently multi-objective problem, since managers want to finish projects as soon as possible with the minimum cost and the maximum quality. However, there are only a few papers dealing with multiobjective resource-constrained project scheduling problems (MORCPSPs). Moreover, there is no theoretical study in the literature that establishes the fundamentals for correct algorithmic developments. In this paper we try to close the gap by proving several results for MORCPSPs. With these results as a basis, both exact and heuristic procedures capable of obtaining a set of efficient solutions for several important MORCPSPs can be created. We develop algorithms for the case where all objective functions are of the same type, called regular. In this case, specific codifications, techniques, and procedures can be used. Extensive computational results help decide which algorithms or techniques are the most promising for the problem. With the aid of these algorithms we study the Pareto fronts in this case. Finally, we apply a metaheuristic algorithm to a particular example of the general case in order to analyse the differences in the Pareto fronts. The project instances and Pareto fronts obtained can be downloaded from a website to facilitate comparisons with future research efforts. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:51 / 62
页数:12
相关论文
共 50 条
  • [31] A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times
    Hosseinian, Amir Hossein
    Baradaran, Vahid
    [J]. RAIRO-OPERATIONS RESEARCH, 2021, 55 (04) : 2093 - 2128
  • [32] A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting
    RezaHoseini, Ali
    Ghannadpour, Seyed Farid
    Hemmati, Maryam
    [J]. JOURNAL OF CLEANER PRODUCTION, 2020, 269
  • [33] Handling Alternative Activities in Resource-Constrained Project Scheduling Problems
    Kuster, Juergen
    Jannach, Dietmar
    Friedrich, Gerhard
    [J]. 20TH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2007, : 1960 - 1965
  • [34] Consolidated optimization algorithm for resource-constrained project scheduling problems
    Elsayed, Saber
    Sarker, Ruhul
    Ray, Tapabrata
    Coello Coello, Carlos
    [J]. INFORMATION SCIENCES, 2017, 418 : 346 - 362
  • [35] A New MBS Representation for Resource-Constrained Project Scheduling Problems
    Hao, Xingxing
    Liu, Jing
    [J]. 2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 217 - 224
  • [36] Adaptive multi-criteria search technique for resource-constrained project scheduling problems
    Ahsan, MK
    Tsao, DB
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2005, 12 (03): : 286 - 295
  • [37] Hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems
    School of Economics and Management, Southeast University, Nanjing 210096, China
    [J]. Dongnan Daxue Xuebao, 2008, 4 (736-740):
  • [38] Differential evolution for solving multi-mode resource-constrained project scheduling problems
    Damak, N.
    Jarboui, B.
    Siarry, P.
    Loukil, T.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2653 - 2659
  • [39] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [40] Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study
    Zarei, Fateme
    Arashpour, Mehrdad
    Mirnezami, Seyed-Ali
    Shahabi-Shahamiri, Reza
    Ghasemi, Mohammad
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 820 - 833