Hybrid genetic algorithm for multi-mode resource-constrained project scheduling problems

被引:0
|
作者
School of Economics and Management, Southeast University, Nanjing 210096, China [1 ]
机构
来源
Dongnan Daxue Xuebao | 2008年 / 4卷 / 736-740期
关键词
Genetic algorithms;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    [J]. Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [2] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Liu, Shixin
    Chen, Di
    Wang, Yifan
    [J]. JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2014, 25 (04) : 609 - 617
  • [3] Hybrid Heuristics for Multi-mode Resource-Constrained Project Scheduling
    Tchao, Celso
    Martins, Simone L.
    [J]. LEARNING AND INTELLIGENT OPTIMIZATION, 2008, 5313 : 234 - +
  • [4] A hybrid genetic algorithm and fuzzy set applied to multi-mode resource-constrained project scheduling problem
    Vartouni, Ali Moradi
    Khanli, Leyli Mohammad
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 26 (03) : 1103 - 1112
  • [5] Applying hybrid genetic algorithm to multi-mode resource constrained multi-project scheduling problems
    Chen, James C.
    Lee, Hung-Yu
    Hsieh, Wen-Haiung
    Chen, Tzu-Li
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2022, 45 (01) : 42 - 53
  • [6] Scatter Search for Multi-mode Resource-constrained Project Scheduling Problems
    Pourghaderi, A. R.
    Torabi, S. A.
    Talebi, J.
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 163 - 167
  • [7] Differential evolution for solving multi-mode resource-constrained project scheduling problems
    Damak, N.
    Jarboui, B.
    Siarry, P.
    Loukil, T.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (09) : 2653 - 2659
  • [8] Bees Algorithm for multi-mode, resource-constrained project scheduling in molding industry
    Oztemel, Ercan
    Selam, Ayse Aycim
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 187 - 196
  • [9] Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    Alcaraz, J
    Maroto, C
    Ruiz, R
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) : 614 - 626
  • [10] A genetic algorithm for multi-mode resource constrained project scheduling problem
    Mori, M
    Tseng, CC
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (01) : 134 - 141