共 50 条
- [1] Applying Genetic Algorithm to Resource Constrained Multi-Project Scheduling Problems [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 633 - +
- [4] Hybrid genetic algorithm for resource constrained multi-project scheduling problem [J]. Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2009, 43 (01): : 23 - 27
- [5] A Hybrid Genetic Algorithm for the Resource Constrained Multi-Project Scheduling Problem [J]. ETFA 2005: 10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2005,
- [7] Development of hybrid genetic algorithm for the resource constrained multi-project scheduling problem [J]. PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE 2005, VOL 3, PTS A AND B, 2005, : 1075 - 1082