Flexible job shop scheduling with lot streaming and sublot size optimisation

被引:70
|
作者
Bozek, Andrzej [1 ]
Werner, Frank [2 ]
机构
[1] Rzeszow Univ Technol, Dept Comp & Control Engn, Rzeszow, Poland
[2] Otto Von Guericke Univ, Inst Math Optimizat, Magdeburg, Germany
关键词
flexible job shop; lot streaming; lot sizing; mixed-integer linear programming; tabu search; constraint programming; UNRELATED PARALLEL MACHINES; FLOW-SHOP; GENETIC ALGORITHM; VARIABLE SUBLOTS; SETUP TIMES; DUAL CRITERIA; TRANSPORTATION; COLONY;
D O I
10.1080/00207543.2017.1346322
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Models and optimisation approaches are developed for a flexible job shop scheduling problem with lot streaming and lot sizing of the variable sublots. A two-stage optimisation procedure is proposed. First, the makespan value is minimised with the smallest sublots defined for the problem instance. This makes it possible to shorten the makespan significantly, because each sublot is transferred separately to the next operation of a job. In the second stage, the sizes of the sublots are maximised without increasing the obtained makespan value. In this way, the quantity of sublots and transport activities is limited together with the related manufacturing cost. Two objectives are defined for the second stage. The first one is the maximisation of the sum of the sublot sizes of all operations, the second one is the maximisation of the number of the operations which do not need to be split at all. Mixed-integer linear programming, constraint programming and graph-based models are implemented for the problem. Two optimisation approaches are developed and compared in computational experiments for each stage and objective, one approach is based on a third-party solver, and the second one on an independent own implementation, namely a tabu search and a greedy constructive heuristic.
引用
收藏
页码:6391 / 6411
页数:21
相关论文
共 50 条
  • [31] Multi-level lot-sizing and job shop scheduling with lot-streaming: Reformulation and solution approaches
    Rohaninejad, Mohammad
    Hanzalek, Zdenek
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 263
  • [32] Flow shop scheduling with no-wait flexible lot streaming using an adaptive genetic algorithm
    Kwanwoo Kim
    In-Jae Jeong
    The International Journal of Advanced Manufacturing Technology, 2009, 44 : 1181 - 1190
  • [33] Flow shop scheduling with no-wait flexible lot streaming using an adaptive genetic algorithm
    Kim, Kwanwoo
    Jeong, In-Jae
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (11-12): : 1181 - 1190
  • [34] Flow shop scheduling with no-wait flexible lot streaming using adaptive genetic algorithm
    Kim, KwanWoo
    Jeong, In-Jae
    ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 474 - +
  • [35] Review on flexible job shop scheduling
    Xie, Jin
    Gao, Liang
    Peng, Kunkun
    Li, Xinyu
    Li, Haoran
    IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2019, 1 (03) : 67 - 77
  • [36] Flexible job shop scheduling with blockages
    Hansmann, R. S.
    Rieger, T.
    Zimmermann, U. T.
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2014, 79 (02) : 135 - 161
  • [37] Flexible job shop scheduling with blockages
    R. S. Hansmann
    T. Rieger
    U. T. Zimmermann
    Mathematical Methods of Operations Research, 2014, 79 : 135 - 161
  • [38] Lot scheduling with multiple process routes in job shop
    Nanjing University of Aeronautics and Astronautics, Nanjing 210016, China
    Zhongguo Jixie Gongcheng, 2008, 2 (183-187):
  • [39] Benefits of lot splitting in job-shop scheduling
    Chinyao Low
    Chih-Ming Hsu
    Kai-I Huang
    The International Journal of Advanced Manufacturing Technology, 2004, 24 : 773 - 780
  • [40] Fuzzy job shop scheduling with lot-sizing
    Sanja Petrovic
    Carole Fayad
    Dobrila Petrovic
    Edmund Burke
    Graham Kendall
    Annals of Operations Research, 2008, 159 : 275 - 292