Flexible job shop scheduling with lot streaming and sublot size optimisation

被引:70
|
作者
Bozek, Andrzej [1 ]
Werner, Frank [2 ]
机构
[1] Rzeszow Univ Technol, Dept Comp & Control Engn, Rzeszow, Poland
[2] Otto Von Guericke Univ, Inst Math Optimizat, Magdeburg, Germany
关键词
flexible job shop; lot streaming; lot sizing; mixed-integer linear programming; tabu search; constraint programming; UNRELATED PARALLEL MACHINES; FLOW-SHOP; GENETIC ALGORITHM; VARIABLE SUBLOTS; SETUP TIMES; DUAL CRITERIA; TRANSPORTATION; COLONY;
D O I
10.1080/00207543.2017.1346322
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Models and optimisation approaches are developed for a flexible job shop scheduling problem with lot streaming and lot sizing of the variable sublots. A two-stage optimisation procedure is proposed. First, the makespan value is minimised with the smallest sublots defined for the problem instance. This makes it possible to shorten the makespan significantly, because each sublot is transferred separately to the next operation of a job. In the second stage, the sizes of the sublots are maximised without increasing the obtained makespan value. In this way, the quantity of sublots and transport activities is limited together with the related manufacturing cost. Two objectives are defined for the second stage. The first one is the maximisation of the sum of the sublot sizes of all operations, the second one is the maximisation of the number of the operations which do not need to be split at all. Mixed-integer linear programming, constraint programming and graph-based models are implemented for the problem. Two optimisation approaches are developed and compared in computational experiments for each stage and objective, one approach is based on a third-party solver, and the second one on an independent own implementation, namely a tabu search and a greedy constructive heuristic.
引用
收藏
页码:6391 / 6411
页数:21
相关论文
共 50 条
  • [41] Fuzzy job shop scheduling with lot-sizing
    Petrovic, Sanja
    Fayad, Carole
    Petrovic, Dobrila
    Burke, Edmund
    Kendall, Graham
    ANNALS OF OPERATIONS RESEARCH, 2008, 159 (01) : 275 - 292
  • [42] Benefits of lot splitting in job-shop scheduling
    Low, C
    Hsu, CM
    Huang, KI
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 24 (9-10): : 773 - 780
  • [43] Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithms
    Chang, Hao-Chin
    Liu, Tung-Kuan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2017, 28 (08) : 1973 - 1986
  • [44] Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithms
    Hao-Chin Chang
    Tung-Kuan Liu
    Journal of Intelligent Manufacturing, 2017, 28 : 1973 - 1986
  • [45] Ant colony optimisation for scheduling of flexible job shop with multi-resources requirements
    Kalinowski, Krzysztof
    Krenczyk, Damian
    Paprocka, Iwona
    Kempa, Wojciech M.
    Grabowik, Cezary
    21ST INNOVATIVE MANUFACTURING ENGINEERING & ENERGY INTERNATIONAL CONFERENCE - IMANE&E 2017, 2017, 112
  • [46] Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance
    Thornblad, Karin
    Stromberg, Ann-Brith
    Patriksson, Michael
    Almgren, Torgny
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 9 (01) : 126 - 145
  • [47] Constructing near optimal schedules for the flow-shop lot streaming problem with sublot-attached setups
    Kalir, AA
    Sarin, SC
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2003, 7 (01) : 23 - 44
  • [48] Production scheduling and lot streaming at flexible job-shops environments using constraint programming
    Novas, Juan M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 136 : 252 - 264
  • [49] Constructing Near Optimal Schedules for the Flow-Shop Lot Streaming Problem with Sublot-Attached Setups
    Adar A. Kalir
    Subhash C. Sarin
    Journal of Combinatorial Optimization, 2003, 7 : 23 - 44
  • [50] Optimal scheduling for flexible job shop operation
    Gomes, MC
    Barbosa-Póvoa, AP
    Novais, AQ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (11) : 2323 - 2353